BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for a mixed-use development in Waukegan, Illinois. Completed plans call for site work for a municipal facility; and for asbestos abatement for a municipal facility.

Questions Due Date/Time: 05/16/2024 12:00 PM, CST Location: Lake County Purchasing : 18 N County St. - 9th Floor Waukegan, Illinois 60085 United States Description: The abatement work includes the removal of designated ACM floor tile, floor tile mastic, ceiling plaster, and pipe fitting insulation from the basement mainframe room at the Lake County Administrative and Courts Complex. ACM ceiling plaster will also be removed in the G27 stairwell. Abatement in the mainframe room will be completed before the G27 stairwell and adjacent storage room. Scaffolding can be installed in the G27 stairwell during abatement in the mainframe room. This work will be done in two phases in each work area where ceiling plaster is being removed. The first phase will include asbestos abatement of the acoustical ceiling plaster skim coat. After passing asbestos clearance sampling, the second phase will include removal of the non-ACM ceiling plaster base coat. See Exhibit B drawings for details of each work area. Work includes construction of isolation barriers, negative pressure enclosures, decontamination units and installation of high-efficiency particulate air (HEPA) filtered air units. All work will be performed in accordance with these specifications, the Environmental Protection Agency (EPA), the Occupational Safety and Health Association (OSHA), the Illinois Department of Public Health (IDPH) and local requirements. This project includes the removal of asbestos-containing material (ACM) floor tile, floor tile mastic, pipe fitting insulation, ceiling plaster skim coat, and non-ACM ceiling plaster base coat from the Mainframe Room at the Lake County Administrative and Courts Complex. The ACM ceiling plaster skim coat and the non-ACM ceiling plaster base coat will be removed in the G27 Stairwell. ACM pipe insulation will be removed from one fitting in a storage room, adjacent to the G27 Stairwell.

Bid Results

Municipal

$42,730.00

Public - County

Asbestos Abatement, Site Work

4

8

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
99
Bidding Soon
2,003
All Active Projects
862
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 24, 2024

img_map_placeholder

18 N County St, Waukegan, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.