BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2024 at 8:00 PM

Updated July 19, 2024

Site work for a mixed-use development in Foley, Alabama. Completed plans call for site work for a playground / park / athletic field.

** As of July 5, 2024, project is on rejected. No definite date for the rebid.** The scope of work consists principally of the purchase and installation of a 4"" irrigation well and 5hp pump for the irrigation of two new soccer fields that will be constructed at the Ralph Schumacher Soccer Park located at 18507 US-98 Provide and install a 4 inch irrigation well with a 5 horsepower pump. It is the intent for this well to pull from ground water. 2) The well should have a minimum pressure rating of 50-60 PSI and 80 GPM. 3) Work shall be performed by a professional well driller and pump installer who is properly licensed in the State of Alabama. 4) Well installation shall include casing, well screen, grout and all other components required for a complete and operational well. 5) Contractor is responsible for connecting all power to ensure the pump is working properly. A 3-phase transformer is being installed at the site and it will have up to 480 volts available. 6) The irrigation well and pump will be required to irrigate an area that is approximately 173,000 square feet in size. 7) Contractor shall dispose of surplus earthwork and drilling waste as agreed upon by the City. 8) Any damage to nearby fields or the surrounding area shall be restored to pre-drilling condition. 9) Conduct a final pump test after well has been constructed to ensure its performance and efficiency. The final location of the well will be determined once new electrical service has been installed. It is preferred that the well be located within 30 feet of the power; however, we won't know the exact distance until the transformer is installed. Any clearing or mowing required will be performed by City forces Question Deadline 07/12/2024 All questions related to this bid must be documented through email and should be sent to Rachel Keith at rkeith@cityoffoley.org no later than 72 hours prior to the scheduled bid opening. No questions will be addressed by any means other than email

Award

Water / Sewer

$14,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
37
Bidding Soon
746
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2024

August 15, 2024

Project location map

18507 US-98, Foley, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.