BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Renton, Washington. Completed plans call for site work for a water / sewer project.

Construct the Burnett Ave S and Williams Ave S Water Quality Retrofit Project. The work to be performed under this contract shall include, but not be limited to: o Construction surveying, staking, and production of as-built plans. o Installing and maintaining adequate TESC measures and restoring all disturbed areas. o Temporary traffic control measures in accordance with the contract documents and applicable City of Renton and MUTCD standards. o Installation of approximately 2,650 linear feet of 8-inch, 12-inch, 15-inch, 18-inch, 24-inch, and 36-inch diameter storm drainpipe, 49 Type 1 and Type 2 catch basins, and two Linear Modular Wetland water quality treatment facilities. o Installation of approximately 425 linear feet of 8-inch sewer main, 26 linear feet of side sewer pipe, and 1 manhole. o Installation of one 12-inch valve, one 4-inch water service relocation, one 6-inch water service location, and 5 water service connections of various sizes. o CCTV inspection of storm drain and sewer mains and testing, poly-pigging, disinfecting and flushing of water mains. o Trench excavation, including removal of existing unsuitable material, removal and abandonment of existing utilities, disposal of excavated material, shoring, and dewatering. o Maintenance of existing utilities, including the structural support of large diameter water transmission mains, critical fiber optic cables, and high pressure gas main. o Removal and replacement of asphalt concrete pavement, asphalt overlay, concrete curbs, gutters, driveways, and 4 curb ramps associated with the installation of utilities. The estimated project cost is $3,260,000 to $3,820,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A total of 130 working days is allowed for completion of the project. Any bids received after the published bid submittal time cannot be considered and will not be accepted. The City reserves the right to reject any and/or all bids and to waive any and/or all informalities. All Bid Proposals shall be accompanied by a Bid Proposal Deposit (certified check or satisfactory bid bond) in an amount equal to five percent (5%) of the amount of such Bid Proposal. The City's Fair Practices, Non-Discrimination, and Americans with Disability Act Policies shall apply. Women and Minority Business Enterprises (WMBE) are encouraged to bid. It is anticipated that this project will be funded in part by the Washington State Department of Ecology. Neither the State of Washington nor any of its departments or employees are, or shall be, a party to any contract or any subcontract resulting from this solicitation for bids.

Bid Results

Water / Sewer

$2,659,249.00

Public - City

Site Work

30

3

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
83
Bidding Soon
2,236
All Active Projects
687
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 23, 2024

July 22, 2024

January 20, 2025

img_map_placeholder

Multiple Locations, Renton, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.