BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in San Diego, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of August 19, 2024 this project has not yet been awarded. A timeline for award has not yet been established. Reference Number 0000351605 The Eastern Hillcrest Bikeways project is constructing an approximate 1.1-mile of separated bikeways and buffered bike lanes along University Avenue from Ninth Avenue to Normal Street, and on Normal Street form University Avenue to Lincoln Avenue in the Hillcrest community in the City of San Diego. Improvements include a neighborhood traffic circle at the intersection of Lincoln Avenue and Centre Street; a pedestrian promenade and separated Class IV bikeway on the western half of Normal Street from University Avenue to Lincoln Avenue; reconfiguration of Normal Street from Lincoln Avenue to Washington Street; restriping on Lincoln Avenue, Herbert Street, Park Boulevard, and Robinson Avenue; and reconfiguration of the intersection of Park Boulevard and Robinson Street. Work of the bikeways improvements includes, but is not limited to, controlling of water pollution; traffic control; erosion control; clearing and grubbing; new curb and gutter, cross gutter, bus pad construction, bus benches, installation of new RRFBs, curb ramps, asphalt paving, storm drain installation, concrete driveway installation, traffic signal modifications, and signing and striping. Work of the pedestrian promenade improvements includes, but is not limited to, concrete sidewalk paving, curb ramps, integral colored concrete, concrete benches, concrete paver installation, decorative LithoMosaic paving, construction of decorative concrete steps, playground equipment installation, custom metal shade structures, fabric shade structures, light pole installation, string light installation, installation of new electrical conduits, storm drain installation, potable water main relocation, a new water service, a new sewer service lateral, installing new irrigation, landscape planting, tree grate installation, and installation of a stationary trolley car (provided by others). The work will also include the procurement of all materials and performing all other work necessary to complete the work in accordance with the project plans and specifications. For the SWPPP, this project is a Risk Level 2. There is no DBE goal for this project. The Engineer's Estimate is $18,151,023.00. This is subject to the Community Benefits Agreement (CBA). Project Duration: 400 working days General Requirements - Contractors License Required - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % Liquidated Damages: $6.000.00 Question Deadline 06/19/2024 at 5:00 PM PT Questions are submitted online Yes .

Bid Results

Roads / Highways

$27,505,919.00

Public - City

Paving, Site Work

209

13

127

9

Subscribe For Documents

82 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
54
Bidding Soon
737
All Active Projects
333
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

August 26, 2024

img_map_placeholder

Multiple Locations, San Diego, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.