BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Cupertino, California. Contact the soliciting agency for additional information.

Location and Description. The Project location includes a number of sites: McClellan Road and Homestead Road over Stevens Creek. Stevens Creek Boulevard, Vallco Parkway, Miller Avenue, and Tantau Road over Calabazas Creek. The project scope is described as follows: Perform maintenance repairs to include methacrylate deck treatment, removal and patching of unsound/spalled concrete, concrete crack repair (epoxy injection), reinforcement repair, expansion joint cleaning and resealing, cold planing/removal and installation of asphalt, deck sealing, cleaning and painting of structural steel, removal and installation of roadway striping and pavement markers, and associated work. Perform maintenance repairs to include methacrylate deck treatment, removal and patching of unsound/spalled concrete, concrete crack repair (epoxy injection), reinforcement repair, expansion joint cleaning and resealing, cold planing/removal and installation of asphalt, deck sealing, cleaning and painting of structural steel, removal and installation of roadway striping and pavement markers, and associated work. Estimated Cost. The estimated construction cost for the base bid items is $975,000. Time for Final Completion. The Project must be fully completed within 115 calendar days from the start date set forth in the Notice to Proceed (Base Items only). Seven calendar days will be added if Bid Alternative 1 is included in the Work. 14 calendar days will be added if Bid Alternative 2 is included in the Work. City anticipates that the Work will begin on or about TBD, but the anticipated start date is provided solely for convenience and is neither certain nor binding. Each bid must be guaranteed by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to the City, or bid bond using the form included in the Contract Documents and executed by a surety licensed to do business in the State of California. Performance and Payment Bonds. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents.

Post-Bid

Bridges / Tunnels

$975,000.00

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
71
Bidding Soon
1,442
All Active Projects
540
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

July 11, 2024

img_map_placeholder

Multiple Locations, Cupertino, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.