BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 6, 2024 at 8:00 PM

Updated May 9, 2024

Site work and paving for a sidewalk / parking lot in Foster City, California. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

In January 2018, Fehr & Peers performed a Bicycle, Pedestrian, and Intersection Evaluation Study (CIP 301-664) to help the City evaluate and determine the current traffic and transportation facilities and potential for improvements. As part of the study, Fehr & Peers performed an assessment for the four public schools that existed in Foster City at the time, to identify improvements to provide more comfortable bicycle and walking routes to school. The report describes citywide travel behavior trends for school trips and then provides a site assessment for each of the schools, including cost estimates for suggested enhancements. Some of the report recommendations have already been implemented. The Bicycle and Pedestrian Improvements Project analyzes the remaining enhancements identified for each of the four Foster City public schools to meet the City's goals for pedestrian safety. The newly constructed Beach Park School would be included in the assessment. Some suggested enhancements include physical changes to the roadway, curb/gutter, or sidewalk, striping, and signage modifications. A consultant would review and analyze the assessment, perform field inspections, and perform additional traffic studies to develop project plans and specifications to implement the enhancements and the potential to implement complementary improvements such as green infrastructure (e.g., stormwater treatment within curb extensions). Based upon the proposed project schedule, an RFP for assessment and design will be issued in 2024. Construction is anticipated in 2025. The project is include in the city's 2023-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$325,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
417
Active Projects
191
Bidding Soon
3,084
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2025

Project location map

To Be Determined, Foster City, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.