Site work, asbestos abatement and renovation of a mixed-use development in Star Lake, New York. Working plans call for the renovation of a educational facility; for asbestos abatement for a educational facility; transportation facility; and for site work for a transportation facility.

As of August 22, 2024, bids received were rejected as they were over the budget. Project will rebid but no definite date yet. SED Control No: 51 -04-01 -04-0-002-027 Main Building 51-04-01-04-5-002-007 Bus Garage Work under this Contract may generally be described to include, but not be limited to the following: Temporary facilities & controls; cutting & patching; removal & disposal of existing mechanical systems and components as scheduled or required for the execution of the work. Procurement and general requirements; items to furnish to G.C.; firestopping; cutting and patching; basic mechanical requirements; general-duty valves for HVAC piping; hangers and supports for HVAC piping and equipment; identification for HVAC piping and equipment; testing, adjusting, and balancing for HVAC; duct insulation; HVAC equipment insulation; HVAC piping insulation; direct-digital control system for HVAC; hydronic piping; hydronic specialties; hydronic pumps; refrigerant piping; HVAC water treatment; ducts and casings; textile air dispersion ductwork; air duct accessories; HVAC power ventilators; air outlets and inlets; HVAC air cleaning devices; packaged air-cooled refrigerant compressor and condenser units; air handling units; dedicated outdoor air units; small-capacity split-system air conditioners; convection heating and cooling units; air coils; all M series drawings; and all other work and related materials as indicated on the Contract Drawings, as specified herein, and as required for the complete and proper execution of the Work within the established time frame. This outline is a general indication of the requirements of this Contract and is not intended to be all inclusive. The complete Contract Documents in their entirety, to include any and all addenda, form the basis of the responsibility of this Contract. Each contractor is advised that the specification sections in Division 1 - General Requirements apply distinctly to each Prime Contractor and the balance of the technical specifications apply to each Contractor (as appropriate) for the accomplishment of his work. All work of this contract shall be coordinated with other Prime Contractors involved in the project. All work shall additionally be coordinated with all other activities, construction, or others at each site throughout the progress of the work of this project. The Contractor shall use all means possible and shall be responsible for coordinating the installation of all materials of this Contract with work of all other trades involved with this project. All work shall be done in strict accordance with the Contract Documents and in compliance with all applicable Local, State and Federal Codes. Prior to the Bid Date of this project, the Contractor shall be completely responsible for visiting the project site to become completely familiar with the scope of this project. Bids shall be prepared as set forth in the Information to Bidders, enclosed in a sealed envelope bearing on its face the name, address and phone number of the bidder and the title of the project. Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and the respective employees, arising out of or in connection with the administration, evaluation or recommendation of any bid. Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and the respective employees, arising out of or in connection with the administration, evaluation or recommendation of any bid. It shall be completely understood that the use of asbestos containing materials in this project is strictly forbidden and all materials are provided in accordance with the Federal Asbestos Hazard Emergency Response Act (AHERA), and the New York State Asbestos Safety Act (SASA). Owner Rights: The Owner further reserves its right to disqualify bidders for any material failure to comply with the Information for Bidders and General, Supplementary, and Special Conditions. The Owner reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after opening. The Owner reserves the right to accept any and/or all of the Bid Items and/or Alternates or any combination thereof and to waive any informalities or defects in the bid proposals either before or after opening.

Final Planning

Transportation Terminals

$900,000.00

Public - State/Provincial

Asbestos Abatement, Renovation, Site Work

154

30

21

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
46
Bidding Soon
545
All Active Projects
256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

January 6, 2025

img_map_placeholder

To Be Determined, Star Lake, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.