BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a road / highway in Middleburg, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

RFB No. 23/24-042, CR 220 Widening Phase 1. Proposals require a five (5%) percent bid bond and may not be withdrawn after the scheduled opening time for a period of thirty (30) days. The term bid bond shall include bonds or cashier or certified checks payable to the County. This project is being supported in part by a Local Transportation Projects Grant through the Florida Department of Transportation. LAST DATE FOR INQUIRIES: June 5, 2024, 4:00 pm Clay County Board of County Commissioners requests bids to perform the widening County Road 220 from existing 2-lane rural roadway to a 4-lane urban roadway from Hollars Place to the West RW of Henley Road and West of CR 739 (Henley Rd) to Chief Ridaught Trail for the construction project listed below. CR 220 Widening Phase 1 Clay County Funded - Hollars Place to the West RW of Henley Road : Part A FDOT Funded - West RW of Henley Road to Chief Ridaught Trail (Financial Project ID: 443396-1-54-01): Part B 3.2. Scope The Contractor will be responsible for performing construction of the Widening County Road 220 from existing 2-lane rural roadway to a 4-lane urban roadway from West of CR 739 (Henley Rd) to Chief Ridaught Trail and Hollars Place to the West RW of Henley Road. Work activities include but are not limited to the following: maintenance of traffic, clearing and grubbing, excavation and grading, erosion and sediment control, milling and asphalt paving, drainage, sodding, signalization, signs, and pavement markings. This project includes all associated work shown in the plans and specifications attached to this bid. All construction shall comply with the Florida Department of Transportation, FY 23/2024 Standard Plans for Road and Bridge Construction including Interim revision and Florida Department of Transportation, FY 24/2025 Standard Specifications for Road and Bridge Construction. Contractor must abide by all documented requirements and general notes as listed in the construction plans. The Contractor shall provide a Critical Path Method (CPM) production schedule meeting the contract days. This schedule shall be held to close scrutiny due to the impact to Inspection Time. If the contractor does not hold to the production schedule, the Contractor may be required to pay for inspection services for downtime of production. Bid Result Part A Kirby Development-6,431,829 Part B Kirby Development-5,321,812

Award

Roads / Highways

$11,753,641.00

Public - County

Paving, Site Work

1

3

43

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
51
Bidding Soon
769
All Active Projects
323
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

August 19, 2024

img_map_placeholder

County Rd 220, Middleburg, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.