Site work and outdoor lighting for a civil project in Lebanon, Oregon. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

Gills Landing Trail The major work to be done includes the following approximate quantities: 470 lineal feet of Saw Cutting, 286 cubic yards of General (hard and lawn surface) Excavation, 555 square yards of Subgrade Geotextile Fabric, 17 lineal feet of 4-inch, Storm Drain Pipe, 201 tons of Aggregate Base, 2,418 square yards of fiber reinforced 4-inch PCC, 5,253 square yards of fiber reinforced 7-1/2 inch PCC, 612 square yards of fiber and rebar reinforced 7-1/2 inch PCC, 22 cubic yards of clean fill dirt Area Restoration, Electrical Conduit, wiring, and installation of 3 Light Poles, Erosion Control Devices, and all equipment, materials, and tools to complete the project as identified within the project drawings and specifications. The Consulting Engineer's Estimate is between $200,000.00 and $240,000.00. Proposals submitted after the above-specified time or with incomplete or incorrect information will be considered non-responsive. If you have any questions concerning the project, please contact Gaylan Morris, Project Manager, at 541-258-4276 or gaylan.morris@lebanonoregon.gov. These specifications are supplemented by City Supplemental Standard Specifications and project Special Provisions. No proposal will be considered unless it contains a statement that the Bidder will comply with the provisions required by ORS 279C.840, that workers of public works be paid not less than prevailing rate of wage on contracts of $50,000.00 or more. Each bid shall contain a statement verifying that the Bidder is a resident bidder as defined in ORS 279A.120. The Contractor or subcontractor must be registered with the Construction Contractors Board as required by ORS Chapter 701. Bidders shall comply with all requirements set forth in Chapter 279A, B, C and other applicable sections of the Oregon Revised Statutes. Bidders are required to disclose proposed first-tier subcontractors. The City of Lebanon encourages the subcontractor disclosure form be submitted with the bid documents but will accept this list no later than 11:00 a.m., June 4, 2024 (two hours after bid opening). All proposals shall be submitted on the prescribed form and in the manner as indicated in the specifications and shall be accompanied by a certified or cashier's check or bid bond in the amount of ten (10) percent of the total amount of the proposal. The bid bond shall be issued by a surety authorized and licensed to issue such bonds in the State of Oregon, conditioned that the successful Bidder will pay the City of Lebanon, as liquidated damages, the amount specified in the bond, unless the Bidder enters into a contract with the Bidder's proposal and furnishes an insurance certificate and a performance bond with surety satisfactory to the City of Lebanon in an amount equal to 100 percent of the contract price within ten days of the date of notification to successful Bidder. If the Bidder fails to enter into the contract and furnish the performance bond within the above-specified time, the check (or bid bond) and the amount thereof shall be forfeited to the City of Lebanon. The City of Lebanon reserves the right to award the contract to the firm submitting the most qualified proposal, to postpone the acceptance of the proposal and the award of contract for a period not to exceed 30 days, or to reject any and all proposals received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work to be completed under this Contract includes the following work on the Gills Landing Trail adjacent to Grant Street in the City of Lebanon, Oregon. The principal features and approximated quantities of the work are as follows: 1. 470 lineal feet of Saw Cutting 2. 286 cubic yards of General (hard and lawn surface) Excavation 3. 555 square yards of Subgrade Geotextile Fabric 4. 201 tons of Aggregate Base 5. 2,418 square yards of fiber reinforced 4-inch PCC 6. 5,253 square yards of fiber reinforced 7-1/2-inch PCC 7. 612 square yards of fiber and rebar reinforced 7-1/2-inch PCC 8. 1-1/2 inch Electrical Conduit, wiring, and installation of 3 Light Poles 9. Complete Work Zone Erosion Control 10. Restoration and Seeding 11. All other additional and incidental work necessary to provide a complete project. This is not an all-inclusive list and quantities are approximate; there are other items of work that must be completed as called for in the project plans and specifications

Post-Bid

Roads / Highways

$240,000.00

Public - City

Outdoor Lighting, Site Work

21

9

4

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
54
Bidding Soon
926
All Active Projects
353
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

July 6, 2024

img_map_placeholder

To Be Determined, Lebanon, OR


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.