BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Glendale, California. Working plans call for the renovation of a educational facility.

**As of June 26, 2024, no bids received. No definite date for the rebid.** Any claim by a bidder of error in its bid must be made in compliance with section 5100 et seq. of the Public Contract Code. Any bid that is submitted after this time shall be non-responsive and returned to the bidder. The Project consists of: Saw cut concrete floors and run conduit, paint entire Kitchen, and install tile. All bids shall be on the form provided by the District. Each bid must conform and be responsive to all pertinent Contract Documents, including, but not limited to, the Instructions to Bidders. To bid on this Project, the Bidder is required to possess one or more of the following State of California Contractor Licenses: Class B Contractor License. The Bidder's license(s) must be active and in good standing at the time of the bid opening and must remain so throughout the term of the Contract. All contractors and sub-contractors of every tier must be registered with the Department of Industrial Relations (DIR). As security for its Bid, each bidder shall provide with its Bid form a cashier's check or a certified check, drawn to the order of the Glendale Unified School District, in the amount of ten percent (10%) of the total bid price. This bid security shall be a guarantee that the Bidder shall, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project. The successful Bidder may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code. The successful Bidder and its subcontractors shall pay all workers on the Project not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, Scope of Work: All work is to be done during summer time; anything that is not completed is to be done at a second shift from 3 to 10 PM. The work area should be cleaned and returned to original condition for use by kitchen staff for next day. All refrigeration, equipment and furniture must be moved by contractor during work and returned to its original location unless specified by the kitchen staff. Contractor should use plastic coverings to set up barrier for dust control; contractor is responsible for all cleanup. 1) Valley View 1) Saw cut approximately 70 feet of concrete 2) Install 2- 1-inch conduit into the ground 3) Install 7 in ground water proof boxes 4) Provide 6 in ground conduit boxes with 12 circuits at 20 amps each with number 10 gauge wires. 5) Provide 1 in ground box with a 220-volt 30 amp circuit with eight gauge wires 6) Must provide plugs and installation services of the equipment upon arrival 7) Close up floor with new concrete 8) Paint new floor concrete to match existing as best as possible 9) Paint approximately 2400 sq. feet of kitchen with two primer coats and a Two coats of paint 10) Mask off all necessary transitions 11) Contractor is to remove all relocate all refrigerators, appliances, and Equipment and is to put back and reinstall everything to its original location Including gas and all electrical that has been disconnected. 12) Contractor is to cap off existing Gas lines and secure 2) Monte Vista 1) Saw cut approximately 65 feet of concrete 2) Install 2- 1-inch conduit into the ground 3) Install 7 in ground water proof boxes 4) Provide 6 in ground conduit boxes with 12 circuits at 20 amps each With number 10 gauge wires. 5) Provide 1 in ground box with a 220-volt 30 amp circuit with eight gauge wires 6) Must provide plugs and installation services of the equipment upon arrival

Final Planning

Educational

$896,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
108
Bidding Soon
2,228
All Active Projects
865
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2024

December 26, 2024

img_map_placeholder

Multiple Locations, Glendale, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.