Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a road / highway in Kaufman, Texas. Completed plans call for site work for a road / highway.
Landscape and Irrigation Improvements for Las Lomas Phase 2 Bids must be accompanied by a cashier's check or a bid bond from a surety company holding a permit in the State of Texas for an amount equal to 2% of the amount bid. The amount of said cashier's check or bond will be forfeited to the OWNER and the bank or surety shall be liable to the OWNER for the amount in event the successful bidder fail or refuse to enter into a contract or furnish bonds as hereafter required within ten (10) days after the date of notice of award Performance, Payment, and Maintenance Bonds are required. The OWNER reserves the right to reject any or all bids and to waive informalities or irregularities in bidding in case of lack of clarity in stating prices. The OWNER reserves the right to consider the most advantageous construction thereof, or reject the bid. Silt Fence is a barrier consisting of geotextile fabric, steel wire fence fabric and supported by steel posts to prevent soil and sediment loss from a site. This includes all labor and materials associated with installation, maintenance, and ultimate removal of the silt fence as shown in the construction drawings or similar document. The purpose of a silt fence is to intercept and detain water-borne sediment from unprotected areas to a limited extent. Silt fence is used during the period of construction near the perimeter of a disturbed area to intercept sediment while allowing water to percolate through. This fence shall remain in place until the disturbed area is permanently stabilized. Silt fences are to be constructed along a line of constant elevation (along contour line) where possible. Silt fence shall not be used where there is a concentration of water in a channel or drainage way or where soil conditions prevent a minimum toe-in depth of 6-inches or installation of support post to depth of 12-inches. If concentrated flow occurs after installation, corrective action shall be taken such as placing a stone overflow in the areas of concentrated flow or replacing the silt fence with a more appropriate control measure
Post-Bid
Roads / Highways
$300,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2024
June 20, 2024
To Be Determined, Kaufman, TX
Related To This Project
Kaufman, TX
--
Kaufman, TX
Bid Date: Jun 18 2024
Kaufman, TX
Bid Date: May 14 2024
Kaufman, TX
Bid Date: May 14 2024
Kaufman, TX
--
Kaufman, TX
--
Kaufman, TX
Bid Date: May 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.