BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Glenora, Manitoba. Completed plans call for site work for a bridge / tunnel.

Work of this Contract comprises of the remediation the Rural Municipality of Argyle - Manitoba EMO Site #1. The overall work will consist of replacing the existing damaged culverts with three (3) new corrugated steel pipe arch culverts, reconstructing the Road 70W embankment, and placement of Rockfill Riprap upstream and downstream of the culvert crossing. Approximately 400 m south of the intersection of Road 70W and Road 17N. Bid Security - Bid Bond 10 % - Performance Bond 50 % - Labor and Materials Bond 50 % Question Acceptance Deadline: 2024/05/23 03:00:00 PM EDT Direct all questions to Justin Saj, M.Eng., P. Eng., Stantec Consulting Ltd., telephone 204-292-6007; e-mail: justin.saj@stantec.com. .2 Verbal answers are only binding when confirmed by written addenda. .3 Clarifications requested by bidders must be in writing not less than five (5) working days before date set for receipt of Bids. Reply may be in form of an Addendum, a copy of which will be forwarded via MERX no later than three (3) working days before receipt of Bids. Questions are submitted online: No Substantial Performance of the Work, by the 31st day of August in the year 2024 Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Bid Results

Bridges / Tunnels

$736,364.00

Public - County

Site Work

8

11

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
3
Bidding Soon
49
All Active Projects
9
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2024

June 24, 2024

img_map_placeholder

Rd 70 W, Glenora, MB

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.