BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2024 at 8:00 PM

Updated December 17, 2024

Renovation of a municipal facility in Cottage Grove, Minnesota. Completed plans call for the renovation of a 13,500-square-foot municipal facility.

The work includes but is not limited to: Removal of temporary ballast and reroof of approx. 13,500sf epdm roof. Removal and reinstallation of associated sheet metal flashing. Bid security in the amount of 5% of the base bid will be required to accompany bids. General Contractor: The roofing contractor shall act as the general contractor for this project. All subcontractors required to complete this work shall be the responsibility of the roofing contractor. Submit with each bid a certified check or acceptable bidders' bond payable to the City of Cottage Grove in the amount equal to five percent (5%) of the total bid. All bids will be evaluated by the Owner and the Architect. The Owner reserves the right to accept any bid or reject any or all bids, or parts of such bids and waive informalities or irregularities in bidding. Successful bidders will be required to furnish satisfactory Labor and Material Payment Bond, Performance Bond, and Certificates of Insurance and a signed contract within 10 days of award of contract. No bidder may withdraw his/her bid for at least 30 days after the scheduled bid opening. The schedule calls for completion by October 1st, 2024. Please direct all inquiries to Todd LaVold at LEO A DALY.

Award

Municipal

$269,000.00

Public - City

Renovation

6

11

5

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
128
Bidding Soon
1,578
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2024

July 26, 2024

Project location map

10125 85th St S, Cottage Grove, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.