Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 9, 2024 at 8:00 PM
Updated May 13, 2024
This is a service / maintenance or supply contract in Anchorage, Alaska. Contact the soliciting agency for additional information.
The Contractor shall conduct a Value Engineering Study for the Seward Hwy: Milepost 25.5-36, Trail River to Sterling Wye Rehabilitation project in accordance with State of Alaska Department of Transportation Policy and Procedure (P&P) 05.01.030, providing a Value Engineering Team consisting of a Team Leader and Team Members. As outline in the P&P, the Team Leader shall be a Certified Value Specialist (or demonstrate comparable experience and expertise), and Team Members shall have experience in disciplines appropriate for the variety of elements associated with the project conditions. The Contracting Agency can supply two to three in-house employees or consultant design team members currently under contract with bridge design, highway design, and construction experience to supplement the VE team's expertise and can also provide meeting room space. The duration of team study is expected to be five days, in or around June of 2024. The study will follow the Value Engineering (VE) Process as described at the following link: online. The Contractor shall prepare a final report of the team's recommendations three weeks after the team study. Estimated period for performance of the Agreement is approximately June 2024 to September 2024. Cost of these professional services is between $100,000 and $150,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Municipal
$150,000.00
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2024
Seward Hwy, Anchorage, AK
Related To This Project
Anchorage, AK
--
Anchorage, AK
Bid Date: May 24 2024
Anchorage, AK
Bid Date: May 23 2024
Anchorage, AK
--
Anchorage, AK
Bid Date: May 31 2024
Anchorage, AK
Bid Date: Jun 07 2024
Anchorage, AK
Bid Date: May 29 2024
Anchorage, AK
Bid Date: Jun 11 2024
Anchorage, AK
Bid Date: Jun 12 2024
Anchorage, AK
Bid Date: May 28 2024
Anchorage, AK
Bid Date: Jun 12 2024
Anchorage, AK
Bid Date: May 24 2024
Anchorage, AK
Bid Date: May 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
