BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2024 at 8:00 PM

Updated July 24, 2024

Site work for a water / sewer project in Halfmoon Bay, Alberta. Conceptual plans call for site work for a water / sewer project.

The Summer Village of Jarvis Bay is seeking the services of a qualified firm or contractor to undertake the conceptual, detailed design and installation of a shoreline open space project. This area has been identified as a priority for council to improve and enhance the natural space. The existing stairways currently provide important lake front access and is a prominent feature in Jarvis Bay. The stairway provides a waterfront pedestrian connection as part of the Villages overall trail network and is used year-round. This stairway was originally constructed with wood and steel stringer material years ago.(date is unknown). Council would like to look at options to replace these stairways, in addition to looking at options to improve the overall landscape of the area. This may include tree/shrub plantings, and/or removal of the existing retaining wall. It is the intent of the Village to keep the space as natural as possible and remove the existing platform. This new initiative will establish and enhance the public space for visitors and for residents. Any landscaping options are to be included in the cost for installation. Cancelled.

Project Abandoned

Water / Sewer

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
17
Bidding Soon
297
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2024

November 1, 2024

Project location map

Jarvis Bay, Halfmoon Bay, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.