BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Perris, California. Completed plans call for site work for a water / sewer project.

**As of November 15, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Schedule A - Mission Canyon I Pipeline: The work comprises construction of approximately 850 linear feet of 12-inch PVC pipe including all appurtenances, connections to existing lines, services, installation of temporary water service to meter at 41477 Gibbel Road, and installation of new fire hydrants. The proposed 12-inch PVC pipe will connect to an existing 6-inch CML&C pipe at Gibbel Road and to the existing Mission Canyon I tank. In addition, the work includes modifications to the above-ground piping and valve enclosure adjacent to the Mission Canyon I Tank. Work shall include all restrained joints, valves, air valves, fire hydrants, water services, shoring and bracing per California Labor Codes, backfill, pavement removal, replacement and restoration, trench and pipeline dewatering, high lining to facilitate service connections as needed, exposure and field welding of existing steel pipe joints, disinfection, traffic control, SWPPP, abandonment of the existing 4" ACP and filling as needed, and other appurtenant work. All work shall be in accordance with these specifications and contract drawings. Schedule B - Mission Canyon II Booster Pump Station Replacement: Under these Specifications the Contractor shall perform all labor, equipment, and materials necessary for construction of a complete and operable booster pump station, including all earthwork (including grading and importing select fill material and backfill material); connections to pipelines; site piping; SCE electrical service installation for new facilities and removal/coordination for existing facility; packaged enclosed skid-mounted booster station, and a packaged enclosed skid-mounted electric generator, motor control center, electrical conduit and wiring; and the complete demolition of the existing Mission Canyon II Pump Station. Site work includes drainage piping, a masonry wall fence, site lighting, a motor operated wrought iron gate, and concrete and asphalt paving. The pipeline work includes approximately 3,200 feet of new 12-inch PVC and approximately 1,000 feet of 8-inch PVC pipe to replace an existing 4-inch CML&C waterline including all pipe, trenching, backfill, compaction, temporary and permanent pavement, air valves, fire hydrants, valves, thrust blocks and restrained joints and all appurtenant work required to complete the pipelines and pump station, complete, in place and operable in accordance with these specifications and the contract drawings. Liquidated Damages $1000.00 License Requirements Classification A - General Engineering Contractor or Classification C - 34 Pipeline Project Duration 640 Calendar days Bid Bond 10.00% Online Q&A Yes Q&A Deadline 09/17/20245:00 PM (PDT) All questions must be submitted through PlanetBids by 5:00 p.m. on Tuesday, September 3, 2024. Please Note: Questions will be answered via Addendum only. Questions received after the deadline will be accepted. However, we do not guarantee that there will be a response to the question. Responses will be on a case-by-case basis. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Work Included in This Section. Principal items are: 1. Furnishing, erection, and removal of forms. 2. Shoring and bracing of formwork. 3. Setting of embedded items, and in non-waterbearing locations setting of pipe sleeves for mechanical and electrical work under direction of respective trade requiring holes for passage of pipe or conduit.

Bid Results

Water / Sewer

$11,331,918.00

Public - County

Site Work

44

97

6

6

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
103
Bidding Soon
2,360
All Active Projects
1,084
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2024

December 9, 2024

img_map_placeholder

Multiple Locations, Perris, CA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.