EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2024 at 8:00 PM

Updated October 1, 2024

Site work and asbestos abatement for an educational facility in Chicago, Illinois. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Orr HS - ACM Abatement ) ACM Abatement of floor tiles, drywall ceiling, and pipe insulation in the basement corridor. 2) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 3) Not responsible for contractor errors as a result of non-field verification. 4) Materials and installation must comply with CPS Standards and Specifications as listed on a) Section 01 56 11: General Dust, Fume and Odor Control b) Section 02 86 13: Hazardous and Universal Waste Management 5) Secure job site overnight if work is not completed in one day. 6) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 7) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 8) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. Question Deadline 05/17/2024 All questions/requests must be received two (2) business days prior to bid closing. Any questions about the scope or clarification shall be obtained prior to bidding. Any interpretation of the design documents shall only be made by the Project Designer.

Bid Results

Educational

$33,874.00

Public - City

Asbestos Abatement, Site Work

6

13

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Painting and Coating, Painting
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings

Find More Local Projects

Within 75 Miles of This Project
256
Active Projects
171
Bidding Soon
2,294
All Active Projects
1,065
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

June 20, 2024

img_map_placeholder

730 N Pulaski Rd, Chicago, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Orr HS - ACM Abatement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.