BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2024 at 8:00 PM

Updated July 17, 2024

Site work and paving for a mixed-use development in Fontana, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work of improvement consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications and Contract Documents for the above stated project. The general items of work to be done hereunder consist of Cold mill or Sawcut and remove full depth asphalt and tree root removals in designated areas, and full depth asphalt replacement Q&A Deadline 05/16/2024 2:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 10 Working Days Estimated Bid Value $175,000.00 Liquidated Damages $1,500 per Day is the minimum value of the costs and actual damage caused by the failure of the Contractor to complete the Work within the allotted time. Bid Valid 90 License Requirements Class "A" contractor's license or a combination of Class "C" specialty contractor's license(s) sufficient to perform the work. Scope of Work A. The Contractor shall assume sole, complete, and continuous responsibility for storm water runoff management and erosion/sedimentation control during construction. The Contractor shall know and fully comply with the applicable provisions of the Manuals and Federal, State, and local regulations that govern the Contractor's operations and storm water discharges from both the project site and areas of disturbance outside the project limits during construction. B. The Contractor shall prepare a storm water management plan for all associated construction activities. This plan shall include drawings showing methods for erosion and sediment control, sediment treatment control, wind erosion, vehicle and equipment tracking control, and non-storm water waste management. The plan shall outline what measures will be used as conditions change along the alignment. The plan shall also include a description of the sequence of construction and all storm water control procedures to be used. C. The Contractor shall fully comply with all applicable state and local regulations and requirements related to storm water management and sedimentation and erosion control including San Bernardino County, City of Fontana, and Caltrans requirements.

Award

Roads / Highways

$79,690.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
589
Active Projects
250
Bidding Soon
3,433
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 24, 2024

Project location map

Lytle Creek Rd, Fontana, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.