Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 11, 2024 at 8:00 PM
Updated July 12, 2024
Renovation of a water / sewer project in Saint Louis, Missouri. Completed plans call for the renovation of a water / sewer project.
Background: The existing water harvesting system (Wahaso) was installed between 2014-2016. After the system was installed the pit/vault the control panels are located in flooded. Since that time the system has not operated. Repair attempts have been made with no success. The goal of this project is to replace the damaged components with a new system that can handle the high heat and moisture environment the system is located in. Work consists of Removal and replacement of existing water harvesting pumps, control panels and components with new pump station including water harvesting pump, control panel and associated system components as outlined in drawing and specifications. Basis of design in Watertronics pump station. An equivalent design will be evaluated for acceptance by National Park Service and Great Rivers Greenway. Inspect all electrical connections, control panels, and electrical wiring to ensure that all is up to code and no damage is present. Remove all unused wires and panels. Install a second sump pump with a battery backup system. (Photos in Appendix A) Question Deadline 05/24/2024 at 5:00 PM CT Background: The existing water harvesting system (Wahaso) was installed between 2014- 2016. After the system was installed the pit/vault the control panels are located in flooded. Since that time the system has not operated. Repair attempts have been made with no success. The goal of this project is to replace the damaged components with a new system that can handle the high heat and moisture environment the system is located in. Work consists of: o Removal and replacement of existing water harvesting pumps, control panels and components with new pump station including water harvesting pump, control panel and associated system components as outlined in drawing and specifications. Basis of design in Watertronics pump station. An equivalent design will be evaluated for acceptance by National Park Service and Great Rivers Greenway. o Inspect all electrical connections, control panels, and electrical wiring to ensure that all is up to code and no damage is present. Remove all unused wires and panels. o Install a second sump pump with a battery backup system. Questions should be directed to Ben Grossman, Director of Greenway Operations, bgrossman @grgstl.or or preferably via the solicitation online . All requests for clarification on these bidding documents must be received in writing by May 24, 2024, 5:00 pm prevailing Central Time A 5% Bid Security in the form specified in the bidding documents is required . Participation Goals for the project are 25% MBE and 5% WBE The District reserves the right to waive informalities in bids, and to reject any and all bids submitted.
Award
Water / Sewer
$276,300.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 7, 2024
July 8, 2024
11 N 4th St, Saint Louis, MO
Related To This Project
Saint Louis, MO
Bid Date: May 21 2024
Saint Louis, MO
Bid Date: Jan 22 2021
Saint Louis, MO
Bid Date: Apr 30 2021
Saint Louis, MO
Bid Date: Jul 08 2021
Saint Louis, MO
Bid Date: Jun 05 2024
Saint Louis, MO
Bid Date: Jun 03 2024
Saint Louis, MO
Bid Date: Aug 01 2024
Saint Louis, MO
Bid Date: Jun 25 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
