BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a bridge / tunnel in Glastonbury, Connecticut. Conceptual plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Over the past 20 +/- years, the Town has successfully utilized the Federal and Local Bridge Program to remove and replace five bridges while realizing 80% grant funding reimbursement. At present, there are no additional bridge structures that meet eligibility requirements for the Federal Local Bridge Program, however, there are bridges which may meet eligibility criteria for the State Local Bridge Program which provides 50% reimbursement of design and construction costs. This proposal assumes Town application and approval under the State Local Bridge Program. Requested funding in FY2024 represents anticipated costs for technical grant application assistance and subsequent design of recommended bridge repairs. Based upon CONNDOT inspection reports, potential initiatives may include parapet/super structure repair to the New London Turnpike bridge over Roaring Brook and measures to address scour concerns at the double steel culvert carrying Roaring Brook under Weir Street. Future cost figures to be refined upon design/permitting completion and detailed structure evaluation. Cost figures do not reflect anticipated 50% State grant reimbursement. As of September 10, 2024, this project is included in the City's 2024-2028 Capital Improvement Program (CIP). Further information regarding a design firm and timeline for construction has not yet been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$2,035,000.00

Public - City

Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
460
Active Projects
215
Bidding Soon
4,773
All Active Projects
2,059
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

To Be Determined, Glastonbury, CT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.