Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and renovation of a bridge / tunnel in Glastonbury, Connecticut. Conceptual plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Over the past 20 +/- years, the Town has successfully utilized the Federal and Local Bridge Program to remove and replace five bridges while realizing 80% grant funding reimbursement. At present, there are no additional bridge structures that meet eligibility requirements for the Federal Local Bridge Program, however, there are bridges which may meet eligibility criteria for the State Local Bridge Program which provides 50% reimbursement of design and construction costs. This proposal assumes Town application and approval under the State Local Bridge Program. Requested funding in FY2024 represents anticipated costs for technical grant application assistance and subsequent design of recommended bridge repairs. Based upon CONNDOT inspection reports, potential initiatives may include parapet/super structure repair to the New London Turnpike bridge over Roaring Brook and measures to address scour concerns at the double steel culvert carrying Roaring Brook under Weir Street. Future cost figures to be refined upon design/permitting completion and detailed structure evaluation. Cost figures do not reflect anticipated 50% State grant reimbursement. As of September 10, 2024, this project is included in the City's 2024-2028 Capital Improvement Program (CIP). Further information regarding a design firm and timeline for construction has not yet been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$2,035,000.00
Public - City
Paving, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
To Be Determined, Glastonbury, CT
Related To This Project
Glastonbury, CT
--
Glastonbury, CT
Bid Date: Oct 29 2024
Glastonbury, CT
--
Glastonbury, CT
Bid Date: Nov 26 2024
Glastonbury, CT
Bid Date: Dec 10 2024
Glastonbury, CT
Bid Date: Dec 17 2024
Glastonbury, CT
Bid Date: Dec 12 2024
Glastonbury, CT
--
Glastonbury, CT
--
Glastonbury, CT
--
Glastonbury, CT
Bid Date: Aug 15 2024
Glastonbury, CT
Bid Date: Jan 08 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.