EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 29, 2024 at 8:00 PM

Updated October 1, 2024

Demolition and site work for an educational facility in Chicago, Illinois. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

Till ES - Staircase Demolition and Rebuild. Provide Labor and Materials: To demolish, repair, and paint the staircase located at the main entrance (Door 1) of Till Elementary School based on the following scope of work and CPS specifications. 1) On exisiting concrete slab on grade 2) Demolish the exisiting steel tread pans, and Terrazzo treads. 3) Replace with new steel tread pans, risers, and concrete threads. 4) Install new 24"X36" Metal access panel with keyed lock. 5) Provide 2'x4' wood blocking at perimeter of opening. 6) Install +- 1'-0" A.F.F. 7) (N) Clip angles. TYP 3/16" 8) (E) Stringers to remain in place. 9) 1/4 " Bent plate steel tread and riser. TYP 10) Cast in place new lightweight concrete tread.11) New tread and riser dimensions to match existing. 12) Provide new tread covers. 13) New L 11/2 x11/2x3/16 Fasten to existing slab with 1/4 " tapcons at 6" O.C 14) 1/4 flat bar closure plate, weld to new angle 15) Prime all new steel with a rust inhibiting coating. 16) Paint all new exposed steel to match exisiting finishes. 17) Provide allowances to touch up exisiting handrails and stringers to remain (+- 50sq.ft.) 18) Contractor to secure necessary permits. 19) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 20) Not responsible for contractor errors as a result of non-field verification. 21) Materials and installation must comply with CPS Standards and Specifications as listed on a) Section 05 50 00 Metal Fabrication b) Section 05 51 00 Metal Stairs c) Section 09 65 00 Resilient Flooring d) Section 03 30 53 Miscellaneous Cast-in-Place Concrete e) Section 09 91 23 Interior Painting 22) Secure job site overnight if work is not completed in one day. 23) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 24) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 25) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 26) Contractor is to remove and dispose of materials torn out and any construction debris. 27) All trash must be removed off-site by contractor. 28) Clean the surrounding area and make sure all is swept of debris. 29) All questions/requests must be received two (2) business days prior to bid closing.

Bid Results

Educational

$73,948.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Tiling, Flooring, Resilient Flooring, Static-Control Resilient Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Wall and Door Protection, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Special Foundations and Load-Bearing Elements, Foundation Anchors

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
166
Bidding Soon
2,133
All Active Projects
1,067
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 24, 2024

img_map_placeholder

6543 S Champlain Ave, Chicago, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Till ES_ Partial Staircase Demonstration and Rebuild

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.