BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Pasadena, Texas. Completed plans call for site work for a water / sewer project.

2024 Citywide Waterline Replacement No bids may be withdrawn after the scheduled closing time for receiving of bids, for at least thirty (30) days. The Owner reserves the right to reject any and/or all bids and to waive formalities. A. This project consist of installation of 2-inch to 8-inch waterlines and fire hydrantsthroughout the project. The Contractor will abandon 2-6-inch waterlines that will be cut and plugged. Meters will need to be relocated to the front from the backyards. Some of these relocations will be either long or short. A licensed plumber will be required to make all necessary connections on the private property portion of the job. The Contractor will be responsible for obtaining all required no cost permits. A "Right of Entry" form will be used to go on private property. COP will provide the form. B. Before beginning of work, take video and photographs of entire project site to establish a record for site conditions before construction. C. Work items may be underutilized, fully utilized or exceeded depending upon work required during the term of the contract. D. The work shall be performed according to City of Pasadena standard specifications and as mentioned in the construction manual. E. It is further understood that the quantities of work to be done and materials to be furnished may be increased or diminished as may be considered necessary, in the opinion of the Engineer, to complete the work fully as planned and contemplated and that all quantities of work, whether increased or decreased, are to be performed at the unit prices set forth except as provided for in the specifications. F. All work and disposal of materialsshall be performed in strict compliance with all applicable federal, state and local statutes. G. Contractor to provide all logos for project signs. City will provide electronic files for logo production. H. Multiple work orders with engineer approved drawings showing specific locations will be issued under this contract after the Notice to Proceed

Award

Water / Sewer

$1,521,440.00

Public - City

Site Work

8

13

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
350
Active Projects
223
Bidding Soon
4,267
All Active Projects
1,733
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.