Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 10, 2024 at 8:00 PM
Updated July 11, 2024
Renovation of a theater / auditorium in Tunica Resorts, Mississippi. Completed plans call for the renovation of a theater / auditorium.
Question Deadline 05/29/2024 Questions received less than two days prior to the date for opening of bids will not be answered. Only questions answered by formal written Addenda will be binding. Gold Strike is requesting proposals from qualified flooring contractors to complete the work herein. Gold Strike is an approximate 700,000 square foot facility with 1,100+ hotel rooms, 1,200 electronic games, 56 table games, sportsbook, fine dining venues, and indoor theatre venue. The theatre venue is both carpeted and hard surface. Contractor will be responsible for the area of work as identified in the drawings attached as 'Exhibit A'. Generally, the contractor is responsible for the following 1. Removal and legal disposal of existing carpet, adhesive and wall base identified for replacement in 'Exhibit A', "Exhibit B' (limits of work are approximate), and during job walk. Substrate shall be made level prior to installation of new products. a. Contractor's proposal shall include the cost of providing dumpster(s) as needed. 2. Replace removed carpet with new Owner provided broadloom carpet, approximately 560 square yards for theater and approximately 450 square yards for the Sportsbooktransition, excluding waste and attic stock. a. Owner shall provide the following: i. Shaw broadloom 36-ounce carpet with bonded pad, ii. Carpet adhesive, iii. Carpet seam sealer. 3. Reuse existing wall base. Repair any loose wall base. 4. At theater, furnish and install stair nosing, Roppe #7 Underlap Carpet Nosing; color #641 Moonrise. 5. Furnish and install any necessary transition strips. 6. Contractor shall include in its proposal the following: a. Labor. b. Adhesives for base, transitions, nosings, etc. c. Repair to wall base to match existing or as specified in 'Exhibit A'. d. Stair tread nosings. e. Transition strips. f. Dumpster costs. g. Costs of home office overhead. h. All necessary equipment and transportation. i. All field costs associated with the work. j. Taxes
Post-Bid
Theaters / Auditoriums
$50,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 31, 2024
July 1, 2024
1010 Casino Center Dr, Tunica Resorts, MS
Related To This Project
Tunica Resorts, MS
Bid Date: Oct 17 2024
Tunica Resorts, MS
Bid Date: Nov 05 2024
Tunica Resorts, MS
Bid Date: Feb 03 2025
Tunica Resorts, MS
Bid Date: Jan 31 2025
Tunica Resorts, MS
Bid Date: Feb 10 2025
Tunica Resorts, MS
Bid Date: Feb 28 2025
Tunica Resorts, MS
Bid Date: Mar 09 2025
Tunica Resorts, MS
Bid Date: Jul 20 2023
Tunica Resorts, MS
Bid Date: Jun 28 2022
Tunica Resorts, MS
Bid Date: Nov 16 2022
Meridian, MS
Bid Date: Jun 04 2024
Sontag, MS
Bid Date: Jun 07 2024
Tupelo, MS
Bid Date: Jun 05 2024
Replacement of Effluent Piping for Clarifier No. 1 and No. 2 at the Industrial Water Plant - 5403552
Pascagoula, MS
Bid Date: Jun 11 2024
Tupelo, MS
Bid Date: Jun 07 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
