BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 14, 2025 at 8:00 PM

Updated April 16, 2025

Site work for a civil project in Mi Wuk Village, California. Completed plans call for site work for a water / sewer project.

Sierra Park Water Company -Water Systems Improvements Project Project Scope: The work generally includes, but is not limited to construction of the following: Installation of an oxidation and filtration treatment system to remove iron and manganese from the groundwater sources. The project includes the installation of a manganese dioxide-Package treatment system, backwash storage tanks, waste storage tank, a mechanical building, and Well 5 and Well 6 improvements, along with implementing remote automation of tank and well operations. Bonds required. Prevailing wages. The proposed work shall be performed in accordance with the plans, specifications and other contract documents for the construction of a water treatment plant, SCADA upgrades, replacement of existing groundwater well pump and well head discharge piping, installation of tank level monitoring and associated ancillary improvements for the purposes of treating groundwater to comply with water quality standards. PROJECT LOCATION: 25538 Wheeler Road, Sierra Village, CA 95335 We are seeking quotes for construction, supplies, materials, equipment, and services (business services, professional services, etc) for the subject project. The selected contractor & its sub-contractors shall comply with California prevailing wage requirements. All Contractors and sub-contractors shall also comply with the guidelines as outlined in the project specifications that can be attained via email. Bond and insurance requirements as outlined in the Front End Specifications (which can be attained via email) apply. Question Deadline 02/12/2025 Questions must be sent to Ernesto Meza, E.I.T., by email to emesto@blackwater-eng.com. The project area is located in Tuolumne County, CA, south ofHighway 108. The work to be performed includes the installation of an oxidation and filtration treatment system to eliminate iron and manganese from the groundwater sources. The installation will include a Manganese Dioxide-Package treatment system, backwash storage tanks, waste storage tank, a mechanical building, and Well 5 and Well 6 improvements, along with implementing remote automation oftank and well operations.

Bid Results

Water / Sewer

$2,199,000.00

Public - City

Site Work

38

26

17

3

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
8
Bidding Soon
676
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

April 11, 2025

Project location map

25538 Wheeler Rd, Mi Wuk Village, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.