Renovation of a municipal facility in Westfield, Massachusetts. Completed plans call for the renovation of a 94,601-square-foot municipal facility.

As of July 16, 2024 project is not awarded yet. Parenzo Hall, Basement Floor The Facilities and Operations Department at WSU is seeking a written response from vendors for the scope of work, The project encompasses two spaces located within the basement level of Parenzo Hall located at Westfield State University, 577 Western Ave, Westfield MA 01085. Room 019 consists of 1,026 Sqft and Room 020 at 1,662 Sqft. The space is accessible through various finished\unfinished stairwells located throughout the building and (1) elevator. The contractor will be responsible for protecting existing finishes from damage. Any damage incurred will be mthe responsibility of the contractor to restore or replace. Each space is equipped with activeventilation and non-operable windows. Proper protection must be utilized to prevent dust and voc from infiltrating the building such as negative air machines and air scrubbers. Daily and Final Cleaning will be the responsibility of the contractor. Products utilized for cleaning will require preapproval by the Awarding Authority for green label verification voc and neutral fragrance. Detail: Provide a Level 2, Salt/Pepper Finish within (2) Basement Rooms of ParenzoHall. Level A Sheen shall be obtained with a gloss reading of 45-60. Floor Surface Polishing and Treatment: Provide polished concrete floor treatment in entirety of slab indicated by drawings. Provide consistent finish in all contiguous areas. Provide all preparations necessary to obtain a finished product. All cracks, spalls and holes shall be properly filled prior to finishing. Diamond polish concrete floor surfaces with power disc machine recommended by floor finish manufacturer. Sequence with coarse to fine grit. Installer to determine the optimum starting grit in order to achieve the specified aggregate exposure. Comply with manufacturer's recommended polishing grits for each sequence to achieve desired finish level. Following the initial passes of metal bond diamonds, the installer shall drop back a minimum of one grit level when transitioning to resin bond diamonds. The separation in grit designation shall be a minimum of 50 for the transitioning step. The installer shall refine each abrasive grit to its fullest potential before moving on to the next level. Floor shall be thoroughly scrubbed between each grit pass to remove all loose material. Level of sheen shall match that of approved mock-up. Expose aggregate in concrete surface only as determined by approved mock-up. All concrete surfaces shall be as uniform in appearance as possible. Polished Concrete: Locate demarcation line between dyed surfaces and other finishes. Polish concrete to the 400 grit level Remove residue with water and buffer pad; reapply as necessary for desired result. Hardener and Densifier Application: First coat of FGS Hardener Plus at 250 ft2/gal (6.25 m2/L), following the 400 grit level. (Lion Hard at 400-600 sq ft / gallon). Second coat of FGS Hardener Plus at 350 ft2/gal (8.75 m2/L), prior to the final polishing pass (Lion Hard at 600-800 sq ft / gallon). Follow manufacturer's recommendations for drying time between successive coats. Remove defects and re-polish defective areas. Finish edges of floor finish adjoining other materials in a clean and sharp manner. Work to be completed by 8/31/24 Work to be performed after normal business hours (2nd\3rd Shift), weekends or holidays.

Post-Bid

Municipal

$30,000,000.00

Public - State/Provincial

Renovation

5

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
177
Bidding Soon
2,962
All Active Projects
1,296
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2024

June 24, 2024

img_map_placeholder

577 Western Ave, Westfield, MA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.