Site work and paving for a civil project in Creston, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.
The work generally consists of the following: Maple Street Water Main Improvements Trench Foundation - 30 TON; Trench Compaction Testing - l LS; Water Main, Trenched, C900 PVC, 6" - 1,160 LF; Water Main, Trenched, C900 PVC, 10" - 20 LF; Water Main with Casing Pipe, Trenched, l0" Casing Pipe, 6" Water Main - 60 LF; Water Service Pipe, Type K Copper, 1" - 1,122 LF; Water Service Pipe, Type K Copper, 1-1/2" - 33 LF; Water Service Pipe, Type K Copper, 2" - 18 LF; Water Service Corporation, l" - 31 EA; Water Service Corporation, 1-1/2" - 3 EA; Water Service Corporation, 2" - 1 EA; Water Service Curb Stop and Box, l" - 31 EA; Water Service Curb Stop and Box, 1-1/2" - 3 EA; Water Service Curb Stop and Box, 2" - l EA; Gate Valve, 6" - 4 EA; Gate Valve, 10" - 2 EA; Fire Hydrant Assembly - 1 EA; Removal of Existing Fire Hydrant - 1 EA; Curb Stop and Box Removal - 8 EA; Water Main Connection No. 1 - 1 EA; Water Main Connection No. 2- l EA; Water Main Connection No. 3 - 1 EA; Full Depth Patch, PCC, 7" Thick- 721 SY; Full Depth Patch, PCC w/ Brick Surfacing, 7" Thick - 640 SY; Removal of Sidewalk - 355 SY; Removal of Driveway - 42 SY; Sidewalk, PCC, 5" Thick - 346 SY; Sidewalk, PCC, 6" Thick - 9 SY; Detectable Warning - 20 SF; Driveway, Paved, PCC, 6" Thick - 42 SY; Painted Pavement Markings, Solvent/Waterborne - 36 STA; Painted Symbols and Legend - 1 EA; Temporary Traffic Control - 1 LS; Conventional Seeding, Fertilizing, and Mulching - 1 LS; Mobilization -1 LS. Building materials, supplies, and equipment incorporated into said improvement are exempt from Iowa Department of Revenue and Finance sales tax and any applicable local option sales tax and school infrastructure local option sales tax pursuant to Iowa Code Sections: 422.42 (15) & (16), and 422.47 (5) Bid Security. Each bidder shall accompany its bid with bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in form acceptable to the Jurisdiction, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check, a certified check, or a bank money order drawn on an FDIC insured bank in Iowa or on a FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chattered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the Jurisdiction. Successful Bidder will be required to furnish Performance, Payment and Maintenance Bond acceptable to the City of Creston on the form provided in the specifications in amounts equal to one hundred percent (100%) of the contract price. Time for Commencement and Completion of Work. Work on the improvement shall be commenced immediately upon issuance of a written Notice to Proceed and be completed as stated below. Contractor will maintain records identifying the materials purchased sales tax exempt and will maintain records verifying the use of said materials on said improvement. Payment to the Contractor for said improvements will be made in monthly estimates and one final payment. Monthly estimates will be equivalent to ninety-five percent (95%) of the contract value of the work completed during the preceding calendar month. Such monthly payment will in no way be construed as an act of acceptance for any part of the work partially or totally. Liquidated damages in the amount of Five Hundred Dollars ($500.00) per working day will be assessed for each day that the work shall remain uncompleted after the end of the contract period with due allowance for extension of contract period due to conditions beyond the control of the Contractor. The CCWW reserves the right to reject any and all bids. It is anticipated that the Notice to Proceed will be issued on or after July 15, 2024 The work under the proposed contract shall be fully completed and ready for final payment within 80 working days. The City of Creston hereby reserves the right to reject any or all bids, to waive informalities and irregularities and to enter into such contract as it may deem to be for the best interest of the City of Creston.
Bid Results
Water / Sewer
$488,393.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2024
July 15, 2024
N Maple St, Creston, IA
Related To This Project
Creston, IA
Bid Date: Jun 18 2024
Creston, IA
Bid Date: Jul 30 2024
Creston, IA
Bid Date: Aug 15 2024
Creston, IA
Bid Date: Jul 25 2024
Creston, IA
Bid Date: Aug 13 2024
Creston, IA
--
Creston, IA
--
Creston, IA
Bid Date: Sep 12 2024
Creston, IA
Bid Date: May 08 2024
Creston, IA
Bid Date: May 17 2024
Creston, IA
Bid Date: Apr 16 2024
Creston, IA
Bid Date: Apr 03 2024
Creston, IA
Bid Date: Mar 05 2024
Creston, IA
Bid Date: Feb 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.