BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a fire / police facility in Denton, Texas. Working plans call for the renovation of a fire / police facility.

The owner has determined a prequalified list of construction managers. Questions Deadline: 5/29/2024 04:00 PM (CT) Questions must be submissions by deadline via IONWAVE only (no emails/no phone calls) The City of Denton, Texas (the "City") is pleased to be accepting proposals and qualifications for a Construction Manager at Risk ("CMAR") to provide, without limitation, material, labor, equipment, supervision, and other services ("the Work") for the Fire Station 5 and 6 Project. The City will be using a one-step selection process in accordance with Texas Government Code Chapter 2269, Subchapter F, to select a single entity to provide pre-construction and construction services, using a Construction Manager at Risk contract. Project Information The Project Information can be found in the Project Charter for the Fire Station 5 & 6 Improvement Project attached to this proposal within the Attachments tab. A. PROJECT INFORMATION 1. The City of Denton seeks to construct two (2) new Fire Stations approximately 12,500 SF each. Fire Station #5 - Demolition of the existing fire station, prepare the location for the Location of Extreme Modular Building (EMB) for temporary Fire Department and build the new Fire Station #5, will include three (3) apparatus bays, living spaces that will support (10) personnel, including two officers. Fire Station #6 - New Fire station will include three (3) apparatus bays, living spaces that will support (10) personnel, including two officers. The work will generally consist of the following: Demo the existing fire station #5. Build a Temporary Extreme Modular Building (EMB) for Denton Fire Department fire station #5. Build Fire Stations #5 & #6 that meet required safety standards for employees and equipment, including private sleeping and hygiene areas, cancer reduction design features, and adequate ventilation and heating systems in the vehicle bays. Install a new generator system to fully power the stations in the event of an emergency. 2. Please see attachment for location of the site, and more information on the project program. PROJECT BUDGET 1. The current budget for the project is approximately $20 million dollars ($20,000,000), including without limitation, the CMAR's preconstruction services, design estimate, home office overhead and profit, and all Cost of the Work items required to deliver the projects per the Contract Documents. For the purposes of responding to this RFP, the CMAR should use the following assumptions: a. The City will be using the Cost of the Work plus Fee with a Guaranteed Maximum Price method of contracting. b. Multiple construction packages will be allowed, but the preconstruction phase services cost models will be required to reflect each construction package. The GMP proposal for each construction package will be reviewed against the cost models for that package provided by the CMAR during the preconstruction phase. PROJECT SCHEDULE 1. The City anticipates issuing a Notice to Proceed with preconstruction services to the selected CMAR in August of 2024. 2. The date for Final Completion (FC) of all project packages is anticipated to be no later than June of 2026. Construction - Start Date 1/6/2025 to Finish Date - 3/6/2026 Pre-Bid Meeting 05/21/2024 at 9:30 AM CT To attend virtually follow the link: https://teams.microsoft.com/l/meetup-join/19%3Ameeting_N2Y5YjcwMzUtNTIxMy00ZGYyLWEyMzktNjRmZTJjYjQwN2I1%40thread.v2/0context=%7B%22Tid%22%3A%228444bd2b-ab3a-4d6b-bac0-a96fe62e9d2a%22%2C%22Oid%22%3A%22e953789c-68df-414a-8895-dd018f6757ab%22%7D Meeting ID: 278 781 979 130 Passcode: KmjVLc Bids Open 06/12/2024 at 1:45 PM CT To attend virtually, join on your computer, mobile app or room device: https://teams.microsoft.com/l/meetup-join/19%3Ameeting_NDUyOTVhNTItMTRkZi00YmQyLWFkNmMtZjJlMmEwNjE5YTIx%40thread.v2/0context=%7B%22Tid%22%3A%228444bd2b-ab3a-4d6b-bac0-a96fe62e9d2a%22%2C%22Oid%22%3A%22e953789c-68df-414a-8895-dd018f6757ab%22%7D Meeting ID: 220 188 255 84 Passcode: t4KZL9

Final Planning

Fire / Police

$20,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

19

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
79
Bidding Soon
3,519
All Active Projects
1,293
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.