BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Hurlburt Field, Florida. Completed plans call for the renovation of a military facility.

319 SOS requires upgrade and repair of its current Access Control System. Please find attached Solicitation, SOW and Wage Determination for more information. Notice Type: Combined Synopsis/Solicitation Solicitation Number: FA441724Q0138 Title: 319 SOS Access Control System Posted Date: 07 May 2024 Solicitation Response Date: 17 May 2024 Set Aside: Total Small Business Set-Aside (see paragraph 6) NAICS Code: 561621 - Security Systems Services Points of Contact: SrA Dorian Mija, dorian.mija@us.af.mil SSgt Trevour Burns, trevour.burns@us.af.mil DESCRIPTION OF SERVICES. The contractor shall provide all management of tools, supplies, equipment, and labor necessary to repair an Access Control System to 319th Special Operations Squadron located at building 91259 on Hurlburt Field, FL. 1.1 BASIC SERVICES. 1.1.1 The contractor shall provide the repair of an Access Control System. To include but not limited to: 1.1.1.1 Quantity of one (1) Identiv upgrade kit to bring M8 to current standards. 1.1.1.2 Velocity Software and Support Agreement to provide current software and firmware upgrades as required including annual technical support. 1.1.1.3 Quantity of one (1) USB style enrollment station. 1.1.1.4 All required cables, connectors, hardware, and fittings. 1.1.1.5 All associated labor, and technical services to upgrade defective M8 panel. 1.1.1.6 Location and rewiring of the primary ACS panel to have 3 doors connected for read-in only. 1.1.1.7 Velocity security management application software license. 1.1.1.8 Upgrade of software and firmware on existing CPU. 1.1.1.9 Removal of old communications equipment no longer needed and upgrade of modules as required. 1.1.1.10 Installation of enrollment station. 1.1.2 The contractor shall provide all material necessary to render a fully operational Access Control System. 1.1.3 The contractor shall provide training on the use and operation of the Access Control System. 1.1.4 The contractor shall provide a 1-year warranty on installation and shall provide manufacturers commercial warranty of all items installed. Any part of the system, including the wiring, installed under this Agreement that proves to be defective in material or workmanship within one (1) year of the date of completion of installation will be repaired or replaced with a new, functionally operative part. Labor and materials required to repair or replace such defective components or to make mechanical adjustments to the system would be free of charge for a period of one (1) year following the completion date of the original installation. 1.1.5 The contractor is responsible for all equipment necessary to meet the requirements and objectives of this Statement of Work. In addition, the contractor shall provide any material equipment necessary to complete the installation, this can include ladders, lifts, hoists, power tools, safety gear or other equipment, tools, supplies necessary to complete installation and provide necessary testing of all installed components.

Post-Bid

Military

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
68
Bidding Soon
1,017
All Active Projects
462
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 20, 2024

June 18, 2024

img_map_placeholder

To Be Determined, Hurlburt Field, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.