Site work and paving for a mixed-use development in Mukilteo, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The work to be performed in the summer of 2024 under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for construction of the Chennault Beach Drive Drainage Improvements located in the western portion of the City of Mukilteo. In general, this Contract provides for the improvements of existing, under-capacity storm system by providing a closed conveyance system with sufficient capacity for a 100-year storm event along Chennault Beach Drive, 62nd Place West, and 64th Place West as shown in the Contract Plans. Improvements consist of the installation of new drainage pipe within the existing right-of-way (ROW), new surface-staked pipe and energy dissipation outfall, relocation of existing storm stubs, shoulder paving and asphalt thickened edges, replacement of existing driveways disturbed as a result of the project, grind and overlay of the roadway within project limits, installing plantings to mitigate disturbances created during construction, permanent signing, construction surveying, traffic control, erosion control best management practices, restoring off-roadway vegetated areas and other work all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. The Contractor is required to visit the site limits prior to bid. No pre-bid site inspection or meeting is scheduled. The work described in these Contract Documents shall be physically completed within 65 Working Days. Bid Bond Required: Each bid shall be accompanied by a bid bond in the form of certified check, cashiers check, or surety bond in an amount equal to at least 5% of the amount of such bid. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid bond shall be forfeited to the City of Mukilteo. Prospective bidders shall make all requests for clarification to Luke Thornton, CIP Project Manager, 11930 Cyrus Way Mukilteo, WA 98275, or by email to lthornton@mukilteowa.gov. All technical questions regarding this project are to be submitted in writing no later than 3:00 P.M. on Tuesday, May 21, 2024. No verbal clarifications will be made. Where necessary, addenda will be completed by email only and each must be acknowledged in the bid submittal. All addenda will be posted for this project at online by Friday, May 24, 2024. The City of Mukilteo reserves the right to reject any and all bids and to waive informalities or minor irregularities, and after careful consideration of all bids and factors involved, make the award to best serve the interests of the City of Mukilteo. Price Range: $2,000,000 to $2,400,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Water / Sewer
$2,400,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 30, 2024
July 30, 2024
Chennault Beach Dr, Mukilteo, WA
Related To This Project
Mukilteo, WA
Bid Date: May 31 2024
Mukilteo, WA
Bid Date: Jul 11 2024
Mukilteo, WA
Bid Date: Jun 27 2024
Mukilteo, WA
Bid Date: Jul 30 2024
Mukilteo, WA
--
Mukilteo, WA
--
Mukilteo, WA
Bid Date: May 21 2024
Mukilteo, WA
Bid Date: May 01 2024
Mukilteo, WA
Bid Date: Mar 26 2024
Mukilteo, WA
Bid Date: Apr 02 2024
Mukilteo, WA
--
Mukilteo, WA
Bid Date: Feb 07 2024
Mukilteo, WA
Bid Date: Nov 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.