BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 14, 2024 at 8:00 PM

Updated June 15, 2024

Site work and asbestos abatement for a municipal facility in Cambridge, Massachusetts. Working plans call for site work for a municipal facility; and for asbestos abatement for a municipal facility.

Q And A Open: 05/08/2024 05:30:00 PM Question Deadline May 22, 2024 at 2:30 AM The MWRA is seeking qualifications statements and proposals from qualified firms interested in providing design, and, if authorized, engineering services during construction and resident engineering services, associated with design and construction of PCB Abatement to the Cottage Farm CSO Facility in Cambridge, MA. The Massachusetts Water Resources Authority (MWRA) operates the Cottage Farm CSO Facility in Cambridge, Massachusetts as part of the wastewater collection system for the metropolitan Boston area. The station is located at 660 Memorial Drive along the northern shore of the Charles River in the Cambridgeport district of Cambridge. The station is situated immediately south of Memorial Drive beyond which is the Cambridge Morse Elementary School, west of the Boston University Bridge, and east of Parkland along the Charles River. Figure 1 in Attachment 1 shows the general site location and the following oblique aerial photograph shows the general site configuration Short list confirm

Final Planning

Municipal

$80,000.00

Public - State/Provincial

Asbestos Abatement, Site Work

9

16

2

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
542
Active Projects
254
Bidding Soon
3,705
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2024

August 1, 2024

Project location map

660 Memorial Dr, Cambridge, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.