Site work and paving for a mixed-use development in Indianapolis, Indiana. Completed plans call for site work for a service station / car wash facility; for paving for a service station / car wash facility; sidewalk / parking lot; and sidewalk / parking lot.

Round 2 Questions due by May 27, 2024, by 3pm. Questions Due Date: May 16th 2024, 3:00 PM EDT IndyGo Carson Transit Center (CTC) Inductive Charging Project Summary: Indianapolis Public Transportation Corp. dba IndyGo, is seeking bids for qualified General Contractors! contractors for site preparation at the Carson Transit Center for furnished inductive charger for Bay D. The site preparation includes paver removal and reinstallation, compacted stone, new installation of conduit, concrete removal and replacement for new conduit, concrete work in Bay D and electrical work. The panel board will be furnished by owner along with an owner's 3rd party to install furnished charger and charging pads. To Register and view this IFB Online. Substantial Completion: Contractor shall be Substantially Complete with all Contract Work within 75 Calendar Days of the Contract Notice to Proceed. Final Completion: Contractor shall complete all activities for the Work required for Final Completion within 89 Calendar Days of the Contract Notice to Proceed

Award

Sidewalks / Parking Lot

$429,595.00

Public - City

Paving, Site Work

23

14

4

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Facility Electrical Power Generating and Storing Equipment, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Unit Paving, Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
39
Bidding Soon
793
All Active Projects
239
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

July 3, 2024

img_map_placeholder

201 E Washington St, Indianapolis, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.