BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a municipal facility in Austin, Texas. Completed plans call for the remodel of a municipal facility.

The Texas Department of Public Safety is seeking bids to complete the Mount Pleasant District Office Minor Office Remodel project. Full details can be found in Exhibit F.6, Statement of Work (SOW), containing a description of work, specifications, requirements, and drawings. 06/11/2024 Anticipated date of Contract Award Question Deadline 05/21/2024 at 3:00 PM CT Last day to submit written questions for clarification to DPS. Questions regarding this solicitation must be in writing and must be submitted to DPS's Contract Administrator by the date and time noted in the table listed in this solicitation. Telephone inquiries will not be accepted. Questions may only be submitted email. 05/28/2024 3:00pm Estimated date for DPS to post Question and Answer (Q&A) document to ESBD. For a contract in excess of $100,000.00 a performance bond will be executed in the amount of the contract conditioned upon the faithful performance of the work in accordance with the plans, specifications, and contract documents. Said bond will be solely for the protection of the state. For a contract in excess of $25,000.00 a payment bond will be executed in the amount of the contract, solely for the protection of all claimants supplying labor and material. s scope of work, showing more detail on the intent of this project. In general, the work includes, but is not limited to, the following items: A. See Mount Pleasant District Office exhibits for complete understanding of demolition and construction scope. This list is generic in nature for major items and intended only to give an overview of general project scope. B. The contractor will be responsible for all demolition as indicated on the project drawings. C. Remove vinyl wallcovering and trim, remove no-use outlets, patch / seal, and finish wall. Paint per specification. Provide clear out-side corner guards. D. Cover and care for existing flooring; carpet, tile, ceramic tile, and rubber cove base. E. Modify ceilings, as needed, throughout work area. F. Replace damaged ceiling grid and tiles. G. Relocate electrical as required at the work areas, including relocation of Light Switches where Doors are Relocated. H. Install and modify AC vents and returns as needed at the specific Work Areas. I. Repair or replace any damaged sheetrock or backing on walls. J. At Office #126; Relocate the Office Door and all Hardware from the Corridor 172 side, to the Corridor 173 side. Patch and Repair and Paint all associated walls; corner to corner. K. At Office #153; Relocate the Office Door and all Hardware from the Corridor 173 side as shown in Exhibit F.12_Mount Pleasant DistrictOffice Floor and Work Plan, and Patch and Repair and Paint all associated walls; corner to corner. L. Outside of Room #104, and across from the Womens Toilet Room; Remove all cabinetry, sink and refrigerator. Install all new upper Cabinets and lower cabinets, to accommodate 1 Small Sink, with a disposal, a DPS provided Counter-Top Ice Maker, as specified, (with all utility components of water, sewer, power) and power for DPS Provided microwave and Coffee Maker. M. At Conference Room #144; Remove existing Cabinetry and prepare for all new upper and lower cabinet units. Maintain a sufficient opening in your Construction, for the return installation of the existing refrigerator, Contractor to provide and install a new 15-inch-wide Sink with a Disposal. Install a new 5 or 6 Gallon, electric Water Heater, in the cabinet space below, plumbed for use at this sink. N. Replace the existing Drain Pump and lines to the waste side of the new sink, and plumb same for efficient daily use of the sink. O. At Room #152: construct a new Z-Shaped wall, per the photo shown on page 4, of Exhibit F.11_Mount Pleasant District Office Existing Conditions Photos, Floor thru the Ceiling, with 1 new Door, to create 2 Offices of this suite; adding 1 new Light Switch; controlling the lights at the new Office, beyond the wall. P. Provide turnkey project as indicated on the drawings and in the IFB

Post-Bid

Municipal

$330,000.00

Public - State/Provincial

Remodeling

6

11

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
31
Bidding Soon
2,363
All Active Projects
857
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.