BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2024 at 8:00 PM

Updated July 10, 2024

Renovation of a municipal facility in Fort Wayne, Indiana. Completed plans call for the renovation of a municipal facility.

Vendors and/or Contractors shall provide a turnkey installation of boilers components and services to upgrade the existing boilers system per the scope of work in the bid documents. Work includes but is not limited to the removal and disposal of (3) old boilers per E.P.A. regulations. The installation of (3) new efficient boilers per specifications, along with modifications to the existing stainless-steel flu pipe, water supply pipes, return pipes, gas, and electrical lines. Along with supplying, and sizing all new piping with insulation, and all necessary items, equipment, and labor needed for a complete installation and proper function of new boilers. Est. Completion Date: Sept. 27, 2024 Questions: Submit written questions to be addressed at Prebid site visit a minimum of two business days prior to the meeting. Scope of Work The following is a general scope of work for the project. The vendor/contractor shall provide the work and materials required for a complete installation that meets local, state, and federal codes. This may not be a completely inclusive list of the required work and materials needed for the turnkey solution. 1. Remove (3) existing boilers per E.P.A regulations and supply and install (3) Lochinvar FBN2001 Crest 99% efficient boilers or approved equal. All spoils generated by this work shall be removed and disposed of off-site by the contractor. 2. Stainless steel flue pipe to be modified as required to meet manufacturers' recommendations for the proper function of new boilers and meet current codes. 3. Reconfigure the heating water supply and return piping as required for the proper function of new boilers and to meet manufacturers' recommendations along with identifying stickers. 4. Reconfigure the existing gas lines to boilers as required to make proper connections to new boilers and to meet manufacturers' recommendations along with identifying stickers. 5. Include all electrical components and modifications as required for proper function and installation of new boilers. 6. All new piping to be insulated.

Award

Municipal

$234,933.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
117
Bidding Soon
1,159
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2024

July 8, 2024

Project location map

1100 Calhoun St, Fort Wayne, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.