BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Fort Wayne, Indiana. Completed plans call for the renovation of a municipal facility.

Vendors and/or Contractors shall provide a turnkey installation of boilers components and services to upgrade the existing boilers system per the scope of work in the bid documents. Work includes but is not limited to the removal and disposal of (3) old boilers per E.P.A. regulations. The installation of (3) new efficient boilers per specifications, along with modifications to the existing stainless-steel flu pipe, water supply pipes, return pipes, gas, and electrical lines. Along with supplying, and sizing all new piping with insulation, and all necessary items, equipment, and labor needed for a complete installation and proper function of new boilers. Est. Completion Date: Sept. 27, 2024 Questions: Submit written questions to be addressed at Prebid site visit a minimum of two business days prior to the meeting. Scope of Work The following is a general scope of work for the project. The vendor/contractor shall provide the work and materials required for a complete installation that meets local, state, and federal codes. This may not be a completely inclusive list of the required work and materials needed for the turnkey solution. 1. Remove (3) existing boilers per E.P.A regulations and supply and install (3) Lochinvar FBN2001 Crest 99% efficient boilers or approved equal. All spoils generated by this work shall be removed and disposed of off-site by the contractor. 2. Stainless steel flue pipe to be modified as required to meet manufacturers' recommendations for the proper function of new boilers and meet current codes. 3. Reconfigure the heating water supply and return piping as required for the proper function of new boilers and to meet manufacturers' recommendations along with identifying stickers. 4. Reconfigure the existing gas lines to boilers as required to make proper connections to new boilers and to meet manufacturers' recommendations along with identifying stickers. 5. Include all electrical components and modifications as required for proper function and installation of new boilers. 6. All new piping to be insulated.

Award

Municipal

$234,933.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
14
Bidding Soon
555
All Active Projects
212
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2024

July 8, 2024

img_map_placeholder

1100 Calhoun St, Fort Wayne, IN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.