BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a military facility in Columbus, Mississippi. Completed plans call for site work for a military facility.

The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform all work in accordance with these specifications. Work includes the design and installation and removal of fencing and replace the fence at the Bowling center Building 736 on Columbus AFB Ms. All material will be contractor furnished. This general outline of work does not, in any way, limit the responsibility of the Contractor to perform all work as specified herein. Please see SOW for further information. Amendment 1: Update the clause dates on the combo-solicitation form to reflect current date changes. Change the POC for the site visit scheduling to TSgt Carson Songy (carson.songy@us.af.mil). Amendment 2: Change the site visit date to: May 15th, 2024 at 0900 CST. Please contact SrA Logan Smith (logan.smith.36@us.af.mil) and TSgt Carson Songy (carson.songy@us.af.mil) for further information. Updated Combo-Solicitation form attached. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform all work in accordance with these specifications. Work includes the design and installation and removal of fencing and replace the fence at the Bowling center Building 736 on Columbus AFB., Ms.. All material will be contractor furnished. This general outline of work does not, in any way, limit the responsibility of the Contractor to perform all work as specified herein. 1.1. Work Included. 1.1.1. Prepare and measure location where fence is to be located. 1.1.2. Construct a 110 +- linear feet 6'-0" chain link fenced area with gates, complete-in place with the following characteristics: 1.1.2.1 Chain-link Fence: a. Material and height: Install a 6-foot-tall chain link fence fabric, brown vinyl coated with brown fence slats. b. The fence shall be supported by metal posts that are installed on concrete footings without damaging existing utilities. Add tension wire to the bottom end of fence to provide support. 1.1.2.2 Gates: a. Install one (1) 4'-0" x 6'-0" swing gate. 1.1.3. Once a job is started, the contractor is expected to finish that job within 30 days from award date, unless directed by 14 CES. Weekends and Public Holidays are considered acceptable delays. 1.1.4. The Contractor will dispose of all scraps and debris after installation at an off-base location and ensure that all scraps and debris are diligently guard against flying debris. Disposal shall be in accordance with existing local, state, and federal regulations and shall not be placed in base refuse dumpsters. 1.1.5. Upon completion of installation the contractor will promptly notify the Contracting Office Representative (COR) for final inspection and acceptance of service. 2.0 Execution: 2.1. Civil Engineering shall appoint a COR to monitor and inspect the project. The COR shall work in cooperation with the Contractor and Contractor's Representative to schedule and coordinate the installation of the fencing where the work is to be performed.

Post-Bid

Military

$100,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
17
Bidding Soon
257
All Active Projects
114
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

July 4, 2024

img_map_placeholder

Columbus Bowling Center, Columbus, MS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.