EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 14, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Sayreville, New Jersey. Completed plans call for the renovation of a educational facility.

HVAC Upgrades at Multiple Schools Should you have any questions, please contact the Architect's office at 866-974-7666. All bidders must use and complete all bid forms provided in the manner designated and must comply with all requirements contained in the instructions and specifications. Bids shall be placed in a sealed envelope with the name of the project clearly marked on the front of the envelope and accompanied by a bid guarantee in the form of a Certified Check, Cashier's Check, or Bid Bond in the amount of Ten Percent 10% of the bid, but not more than $20,000. SINGLE-OVERALL CONTRACT Sealed Bid Proposals shall be received as follows: The bidder shall be classified by the New Jersey Department of the Treasury, Division of Property Management and Construction (DPMC) in the following trade(s): C032 - HVACR Subcontractors named in the Form of Bid Proposal for Structural Steel, Plumbing, Heating Ventilating and Air Conditioning, and/or Electric, who perform any work on the Project must be prequalified prior to the submission of bids, pursuant to the State of New Jersey Division of Property Management and Construction (DPMC). Each bid must be accompanied by proof of Contractor's DPMC classification status. Bidders are required to comply with requirements of N.J.S.A. 10:5-1 et seq., "The Law Against Discrimination," and affirmative action, N.J.S.A. 10:5-31 et seq. and N.J.AC. 17:27-1 et seq. All bidders and their subcontractors shall be registered with the New Jersey Department of Labor and Workforce Development, pursuant to the Public Works Contractor Registration Act, N.J.S.A. 34:11-56.48 et seq. prior to award; prior to award, bidder must provide a Certificate issued by the New Jersey Department of Labor and Workforce Development, pursuant to the Public Works Contractor Registration Act, and a New Jersey Business Registration Certificate issued by the New Jersey Department of Treasury, Division of Revenue pursuant to N.J.S.A. 52:32-44 for the bidder and any subcontractors included in the Contractor's bid. Pursuant to N.J.S.A. 52:32-44, Business Registration of Public Contractors, the bidder, and all named subcontractors must provide a New Jersey Business Registration Certificate issued by the New Jersey Department of Treasury, Division of Revenue.If not included with the bid, these documents must be submitted prior to award. The Owner reserves the right to reject all bids and waive any minor immaterial informality in the bidding process in accordance with the law. The Contract, if awarded, shall be awarded to the lowest responsible bidder whose bid is responsive in all material respects to the bid requirements. No bid shall be deemed accepted until the adoption of a formal resolution by the Owner. **Pre-Bid notes: Due to the special nature of the work involved that can only be seen by an in-depth visitation, bidders are STRONGLY ENCOURAGED to visit the project sites as an integral and important element of the bidding process so that all bidders have an equal understanding of the scope of work involved Project Buildings: Arleth Elementary School 3198 Washington Road Parlin, New Jersey 08859 Selover Elementary School 150 Lincoln Street South Amboy, New Jersey 08879 Sayreville War Memorial High School 820 Washington Road Parlin, New Jersey 08859 The Work of Project is defined by the Contract Documents and generally consists of but is not limited to the following: 1. Replacement of existing above ceiling unit ventilators and horizontal unit ventilators, including masonry infill and new masonry openings. 2. Replacement of existing AHUs, ductwork, and associated components, 3. Replacement and upgrades of mechanical room pumps, piping, and equipment, 4. Replacement of portions of floor and ceiling finishes and modifications to aluminum window systems. 5. Replacement and upgrades of rooftop mechanical equipment, gas piping, and associated components

Bid Results

Educational

$22,819,000.00

Public - City

Renovation

370

20

11

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Field Samples, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Water, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Siding, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers, Manufactured Exterior Specialties, Window Wells
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Central Heating Equipment, Heating Boilers, Condensing Boilers, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Ventilators, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Earthwork Methods, Slope Protection, Containment Barriers, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps, Mobile Plant Equipment, General Vehicles, Carts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
560
Active Projects
317
Bidding Soon
5,069
All Active Projects
2,345
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

July 11, 2024

img_map_placeholder

Multiple Locations, Sayreville, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

HVAC Upgrades at Multiple Schools

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.