Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Warwick, Rhode Island. Completed plans call for site work for a water / sewer project; and water / sewer project.
What the project will include The project will include to improves to the stormwater collection and conveyance system at PVD to reduce infiltration, potentially improve water quality and reduce flow, and convey stormwater runoff away from pavements and safety areas effectively. The PVD airfield stormwater management system includes inlets, manholes, pipe networks, open channels, detention basins, and water quality features. Each sealed bid shall be accompanied by a certified check, cashier's check or satisfactory Bid Bond, in an amount equal to five percent (5%) of the bid, payable to the Rhode Island Airport Corporation. The successful bidder will be required to execute and furnish a Performance Bond, and Labor and Materials Payment Bond as security for faithful performance and payment of all bills and obligations arising from the performance of the work. Each security shall be in an amount of not less than 100% of the contract price and shall be in a form acceptable to the Owner. All questions or requests for clarification regarding the bid documents or the project are to be submitted by email to the Office of Procurement via email at procurement@pvdairport.com. The deadline for submission of questions is by 2:00 PM on May 22, 2024. These requirements apply to all Bidders, including those who qualify as a DBE. RIAC, utilizing race-neutral DBE procedures has established an overall three-year DBE participation goal is 3.2% for FAA funded projects for federal fiscal years 2024 through 2026. Timetables Goals for minority participation for each trade: 3.0% Goals for female participation in each trade: 6.9% The contract time is as stated in Section 80 of the FAA General Provisions. This project will be constructed during the Spring of 2025.
Post-Bid
Water / Sewer
$600,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
15
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
June 14, 2024
July 5, 2024
Multiple Locations, Warwick, RI
Related To This Project
Warwick, RI
Bid Date: Jun 18 2024
Warwick, RI
--
Warwick, RI
--
Warwick, RI
--
Warwick, RI
Bid Date: Jun 11 2024
Warwick, RI
Bid Date: Jun 11 2024
Warwick, RI
Bid Date: Jul 16 2024
Warwick, RI
Bid Date: May 17 2024
Warwick, RI
Bid Date: May 21 2024
Warwick, RI
--
Warwick, RI
Bid Date: May 23 2024
Warwick, RI
Bid Date: May 15 2024
Warwick, RI
Bid Date: May 14 2024
Warwick, RI
Bid Date: May 15 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--