BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2026 at 7:00 PM

Updated January 14, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Stockton, California. Design plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Project scope consists of but is not limited to replacement of 2 aging bridges across the Stockton Channel on Interstate 5. As of January 13, 2026, per the owner, the project is still in Design and Permit acquisition as well as RW acquisition.  The project is scheduled to complete Design in Summer 2027 and Construction to begin Late 2027/Early 2028. A Construction manager has been selected through a Construction Manager–General Contractor (CMGC) method.

Design

Bridges / Tunnels

$900,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
13
Bidding Soon
2,016
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2027

Project location map

Multiple Locations, Stockton, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.