Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Dearborn, Michigan. Completed plans call for the renovation of a educational facility.
Reference Number 0000352213 Job Location 5101 Evergreen Rd, Dearborn, MI 48128 . The Board of Trustees of Henry Ford College hereby invites the submission of Sealed Bids for the Classroom Flooring Upgrade Project from qualified, responsible contractors with the ability to perform successfully under the terms and conditions of the proposed procurement Question Deadline 05/21/2024 at 4:00 PM ET Questions are submitted online No. Purchasing Department: Dan Murray, Interim Purchasing Director, Email: dmurray8@hfcc.edu Questions regarding specifications, scope of work or bid procedures should be directed to the Purchasing Director. General Requirements - Installation Required - Insurance Required. The right to reject any and/or all bids is reserved. The college will not consider or accept a response received after the date and time specified above. 1 Remove existing finish floor materials in areas as indicated on the plans. 2 Remove existing wall base meterial in areas as indicated on the plans. 3 Prepare existing floor surfaces per manufacturer's requirements to accept new finish flooring. 4 Prepare existing wall base per manufacturer's requirements to accept new vinyl wall base. Henry Ford College (HFC) seeks to upgrade the flooring in five (5) classrooms in the Health Sciences Education Building (Building G) on main campus located in Dearborn, Michigan. The project will be constructed in one phase depending upon the Owner's approved budget. B. SCOPE OF WORK: The scope of the Contractor's work shall include: 1) Remove existing finish floor materials in areas as indicated on the plans. 2) Remove existing wall base material in areas as indicated on the plans. 3) Prepare existing floor surfaces per manufacturer's requirements to accept new finish flooring. 4) Prepare existing wall base per manufacturer's requirements to accept new vinyl wall base. 5) Install new finish flooring and wall base in areas indicated on the plans. 6) Protect all finish work to remain from damage during demolition. Repair of damaged existing finishes will be at the Contractor's expense. 7) Moving and covering furniture and placing all furniture back to its original place. 8) Cost of final cleaning which includes but is not limited to: vacuuming flooring material installed or affected directly by the project and dusting of all surfaces including walls, windowpanes, doors, furniture, and equipment. The project site is to be left in the same condition it was prior to construction. 9) Be responsible for the execution of this contract, including materials and workmanship of any firm acting as subcontractor. The Contractor shall be responsible for providing subcontractor(s) with complete and up to date drawings, specifications, or other information issued by the Architect or the College. A. If the Contractor chooses to subcontract any installation service or other portion of this specification, the Contractor shall fully warrant prompt performance of the subcontractor in a fully complete, workmanlike manner customary to the trade. B. Failure by the subcontractor to perform in a timely manner shall not relieve the Contractor of its obligations to make the complete and timely delivery of the products or services specified herein at no additional cost to HFC. 10) Coordinate installation schedules with the College. The College will work closely with the Contractor to provide all information necessary for the Contractor to meet deadlines. 11) Assign a project manager to the project who shall be responsible for all aspects of the work. The Contractor shall notify the College's designee of all work schedules and timelines. The College reserves the right to reject the Contractor's proposed project manager without penalty and to request a substitution. 12) Exercise due care throughout the installation and repair any damage to HFC property caused by the Contractor's workforce. 13) Store all equipment and materials at the Contractor's location until ready to begin work. There are no storage sites available at the College prior to the start of the work.
Bid Results
Educational
$29,118.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 30, 2024
July 1, 2024
5101 Evergreen Rd, Dearborn, MI
Related To This Project
Dearborn, MI
Bid Date: May 29 2024
Dearborn, MI
Bid Date: May 23 2024
Dearborn, MI
--
Dearborn, MI
Bid Date: May 31 2024
Dearborn, MI
Bid Date: May 30 2024
Dearborn, MI
Bid Date: May 28 2024
Dearborn, MI
--
Dearborn, MI
Bid Date: May 30 2024
Dearborn, MI
Bid Date: May 16 2024
Dearborn, MI
Bid Date: May 17 2024
Dearborn, MI
Bid Date: May 29 2024
Dearborn, MI
Bid Date: May 29 2024
Dearborn, MI
--
Dearborn, MI
Bid Date: May 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.