BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Dearborn, Michigan. Completed plans call for the renovation of a educational facility.

Reference Number 0000352213 Job Location 5101 Evergreen Rd, Dearborn, MI 48128 . The Board of Trustees of Henry Ford College hereby invites the submission of Sealed Bids for the Classroom Flooring Upgrade Project from qualified, responsible contractors with the ability to perform successfully under the terms and conditions of the proposed procurement Question Deadline 05/21/2024 at 4:00 PM ET Questions are submitted online No. Purchasing Department: Dan Murray, Interim Purchasing Director, Email: dmurray8@hfcc.edu Questions regarding specifications, scope of work or bid procedures should be directed to the Purchasing Director. General Requirements - Installation Required - Insurance Required. The right to reject any and/or all bids is reserved. The college will not consider or accept a response received after the date and time specified above. 1 Remove existing finish floor materials in areas as indicated on the plans. 2 Remove existing wall base meterial in areas as indicated on the plans. 3 Prepare existing floor surfaces per manufacturer's requirements to accept new finish flooring. 4 Prepare existing wall base per manufacturer's requirements to accept new vinyl wall base. Henry Ford College (HFC) seeks to upgrade the flooring in five (5) classrooms in the Health Sciences Education Building (Building G) on main campus located in Dearborn, Michigan. The project will be constructed in one phase depending upon the Owner's approved budget. B. SCOPE OF WORK: The scope of the Contractor's work shall include: 1) Remove existing finish floor materials in areas as indicated on the plans. 2) Remove existing wall base material in areas as indicated on the plans. 3) Prepare existing floor surfaces per manufacturer's requirements to accept new finish flooring. 4) Prepare existing wall base per manufacturer's requirements to accept new vinyl wall base. 5) Install new finish flooring and wall base in areas indicated on the plans. 6) Protect all finish work to remain from damage during demolition. Repair of damaged existing finishes will be at the Contractor's expense. 7) Moving and covering furniture and placing all furniture back to its original place. 8) Cost of final cleaning which includes but is not limited to: vacuuming flooring material installed or affected directly by the project and dusting of all surfaces including walls, windowpanes, doors, furniture, and equipment. The project site is to be left in the same condition it was prior to construction. 9) Be responsible for the execution of this contract, including materials and workmanship of any firm acting as subcontractor. The Contractor shall be responsible for providing subcontractor(s) with complete and up to date drawings, specifications, or other information issued by the Architect or the College. A. If the Contractor chooses to subcontract any installation service or other portion of this specification, the Contractor shall fully warrant prompt performance of the subcontractor in a fully complete, workmanlike manner customary to the trade. B. Failure by the subcontractor to perform in a timely manner shall not relieve the Contractor of its obligations to make the complete and timely delivery of the products or services specified herein at no additional cost to HFC. 10) Coordinate installation schedules with the College. The College will work closely with the Contractor to provide all information necessary for the Contractor to meet deadlines. 11) Assign a project manager to the project who shall be responsible for all aspects of the work. The Contractor shall notify the College's designee of all work schedules and timelines. The College reserves the right to reject the Contractor's proposed project manager without penalty and to request a substitution. 12) Exercise due care throughout the installation and repair any damage to HFC property caused by the Contractor's workforce. 13) Store all equipment and materials at the Contractor's location until ready to begin work. There are no storage sites available at the College prior to the start of the work.

Bid Results

Educational

$29,118.00

Public - City

Renovation

9

8

5

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
105
Bidding Soon
1,498
All Active Projects
620
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2024

July 1, 2024

img_map_placeholder

5101 Evergreen Rd, Dearborn, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.