BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2025 at 8:00 PM

Updated February 3, 2026

Demolition, site work, renovation and addition to an educational facility in Saint Louis, Missouri. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

As of August 28, 2025, construction is underway. The owner has selected a construction manager for the project. A firm timeline for construction has not been established; however, completion is expected in the spring of 2026. Original solicitation below for reference: The Social Sciences Building (SSB) on the North Campus of the University of Missouri-St. Louis consists of a four-story classroom building and a thirteen-story faculty office tower, both originally constructed in 1968. The current project is the third phase of a plan to modernize and expand the facility to accommodate the College of Education and the Honors College, which are being relocated from their current facilities on South Campus. Prior enabling projects include a four- story elevator addition which is nearing completion, and demolition of the thirteen-story tower and connector which is currently out for bid with work expected to be completed this summer. The $23.6M GMP will construct a new 34,000 square foot addition east of the existing classroom building, will renovate approximately 23,000 square feet of the existing building primarily on Levels 2 and 3, and will replace existing infrastructure including boilers, air handlers, fire alarm system, and standpipes. Program elements include classrooms, faculty and administrator offices, a multipurpose event space, conference and meeting rooms, and open study and collaboration space. Site work, footings, and foundations for the addition will begin in August as soon as the tower demolition is complete. Renovations will begin in November for completion ahead of the Fall 2025 semester, and the building addition will continue through the end of the year for completion ahead of the Spring 2026 semester This project shall have a Supplier Diversity participation goal of 25% Minority Business Enterprise (MBE), 10% Women Business Enterprise (WBE)//Disadvantage Business Enterprise (DBE), and a 3% Veteran/Service-Disabled Veteran (SDVE) of the GMP. The Construction Manager at Risk is strongly encouraged to include minority and women owned firms. CMRs are also strongly encouraged to include Missouri-based firms on the team. This project shall have a Supplier Diversity participation goal of 25% MBE and 10%WBE/DBE/Veteran combined and 3% Service-Disabled Veteran of the GMP. The Construction Manager at Risk is strongly encouraged to include minority and women owned firms. CMRs are also strongly encouraged to include Missouri-based firms on the team. All questions about the meaning or intent of the Proposal Documents are to be directed to the Owner. Questions concerning the Proposal Documents may be directed to: John Neal Facilities Planning and Development University of Missouri System 573-489-5426 No Proposer may withdraw its Proposal within one hundred twenty (120) days after the actual date of the opening of the Proposals. Owner reserves the right to reject any or all Proposals, and to waive any informalities or irregularities therein. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Under Construction

Educational

$24,200,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

20

7

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
179
Bidding Soon
1,472
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

October 16, 2024

Project location map

1 University Blvd, Saint Louis, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.