Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Sanford, Maine. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Project consists of the removal of existing asphalt concrete pavement and underlying gravel and soils materials to allow for the emplacement of new asphalt concrete pavement, both heavy duty and standard duty, for the Organizational and Non-Organizational parking lots at the Sanford Armory. Total area for this project is approximately 6.851 square yards. Project includes demolition of existing concrete pads and the installation of an 8-inch thick, 50 ft x 100 ft reinforced concrete pad. Project scope also includes landscaping, stormwater measures, parking lot marking, electrical, and gate replacement. The cost of the work is approximately $ 879,800. The contract shall designate the Substantial Completion Date on or before 15 October 2024, and the Contract Final Completion Date on or before 31 October 2024, . The Owner reserves the right to accept or reject any or all bids as may best serve the interest of the Owner. Bid security is required on this project. If noted above as required, the Bidder shall include a satisfactory Bid Bond (section 00 43 13) or a certified or cashier's check for 5% of the bid amount with the completed bid form submitted to the Owner. The Bid Bond form is available on the BGS website Performance and Payment Bonds are required on this project If noted above as required, or if any combination of Base Bid and Altemate Bids amounts selected in the award of the contract exceeds $125,000.00, the selected Contractor shall fumish a 100% contract Performance Bond (section 00 61.13.13) and a 100% contract Payment Bond (section 00 61 13.16) in the contract amount to cover the execution of the Work. Bond forms are available on the BGS website. . There are no Pre-qualified General Contractors on this project. If Pre-qualified General Contractors are identified for this project, the name of each company, with their city and state, are listed below
Post-Bid
Sidewalks / Parking Lot
$879,800.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2024
July 8, 2024
88 William Oscar Emery Dr, Sanford, ME
Related To This Project
Sanford, ME
Bid Date: Jun 26 2024
Sanford, ME
--
Sanford, ME
Bid Date: Sep 12 2024
Sanford, ME
--
Sanford, ME
--
Sanford, ME
--
Sanford, ME
--
Sanford, ME
Bid Date: Aug 28 2024
Sanford, ME
Bid Date: May 27 2024
Sanford, ME
--
Sanford, ME
--
Sanford, ME
Bid Date: Mar 07 2024
Sanford, ME
Bid Date: Mar 07 2024
Sanford, ME
Bid Date: Feb 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.