Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 4, 2024 at 8:00 PM
Updated June 5, 2024
Site work for an educational facility in Abilene, Texas. Completed plans call for site work for a educational facility.
Poles and Stanchions The contractor shall be responsible for the following tasks, categorized by priority and specific diagrams provided: Priority #1: Completion Deadline - June 21, 2024 1. Pole Circles Installation (Refer to Diagram A - Site Layout A1): 2. Dig and set two pole circles, each consisting of 24 poles using 40' Class 5 poles, and a central pole using a 65' Class 1 pole. 3. Total of 50 poles will be provided by TSTC.. 4. Pole Grid Installation (Refer to Diagram B - Site Layout A1): 5. Dig and set a grid of 24 Class 5, 40' poles. 6. All poles will be provided by TSTC. Priority #2: Completion Deadline - July 26, 2024 1. Feeder Line and Stub Poles Installation: 2. Dig and set one feeder line using 12 Class 5, 40' poles. 3. Dig and set 32 stub poles, cutting each to ensure 15' remains above ground. 4. All poles will be provided by TSTC. 5. Transmission Structure Installation: 6. Dig and set a structure using 7 Class 1, 65' poles. 8. All poles will be provided by TSTC. 9. Additional Feeder Line Installation: 10. Dig and set an additional feeder line using 12 Class 5, 40' poles. 11. All poles will be provided by TSTC. 12. Metering Poles Installation (Refer to Diagram C - Site Layout A1): 13. Dig and set metering poles using 50 Class 5, 40' poles. The center poles will be full length, while surrounding poles will be cut to 15' above ground. 14. All poles will be provided by TSTC. It may be determined that clarifications or interpretations of the Contract Documents are necessary. Upon direction by ODR, such clarifications or interpretations will be provided by A/E consistent with the intent of the Contract Documents. A/E will issue these clarifications with reasonable promptness to Contractor as A/E's supplemental instruction ("ASI") or similar instrument. If Contractor believes that such clarification or interpretation justifies an adjustment in the Contract Sum or the Contract Time, Contractor shall so notify Owner in accordance with the provisions of Article 11.
Award
Educational
$100,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2024
June 24, 2024
2082 Quantum Lp, Abilene, TX
Related To This Project
Abilene, TX
--
Abilene, TX
--
Abilene, TX
--
Abilene, TX
--
Abilene, TX
--
Abilene, TX
--
Abilene, TX
--
Abilene, TX
--
Abilene, TX
Bid Date: Jul 17 2025
Abilene, TX
--
Abilene, TX
Bid Date: May 16 2024
Abilene, TX
Bid Date: May 21 2024
Abilene, TX
Bid Date: May 09 2024
Abilene, TX
Bid Date: May 14 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
