BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for an educational facility in Abilene, Texas. Completed plans call for site work for a educational facility.

Poles and Stanchions The contractor shall be responsible for the following tasks, categorized by priority and specific diagrams provided: Priority #1: Completion Deadline - June 21, 2024 1. Pole Circles Installation (Refer to Diagram A - Site Layout A1): 2. Dig and set two pole circles, each consisting of 24 poles using 40' Class 5 poles, and a central pole using a 65' Class 1 pole. 3. Total of 50 poles will be provided by TSTC.. 4. Pole Grid Installation (Refer to Diagram B - Site Layout A1): 5. Dig and set a grid of 24 Class 5, 40' poles. 6. All poles will be provided by TSTC. Priority #2: Completion Deadline - July 26, 2024 1. Feeder Line and Stub Poles Installation: 2. Dig and set one feeder line using 12 Class 5, 40' poles. 3. Dig and set 32 stub poles, cutting each to ensure 15' remains above ground. 4. All poles will be provided by TSTC. 5. Transmission Structure Installation: 6. Dig and set a structure using 7 Class 1, 65' poles. 8. All poles will be provided by TSTC. 9. Additional Feeder Line Installation: 10. Dig and set an additional feeder line using 12 Class 5, 40' poles. 11. All poles will be provided by TSTC. 12. Metering Poles Installation (Refer to Diagram C - Site Layout A1): 13. Dig and set metering poles using 50 Class 5, 40' poles. The center poles will be full length, while surrounding poles will be cut to 15' above ground. 14. All poles will be provided by TSTC. It may be determined that clarifications or interpretations of the Contract Documents are necessary. Upon direction by ODR, such clarifications or interpretations will be provided by A/E consistent with the intent of the Contract Documents. A/E will issue these clarifications with reasonable promptness to Contractor as A/E's supplemental instruction ("ASI") or similar instrument. If Contractor believes that such clarification or interpretation justifies an adjustment in the Contract Sum or the Contract Time, Contractor shall so notify Owner in accordance with the provisions of Article 11.

Award

Educational

$100,000.00

Public - State/Provincial

Site Work

3

4

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
4
Bidding Soon
147
All Active Projects
64
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.