Site work and paving for a sidewalk / parking lot in Riverton, Utah. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Rebuild/Redeck two (2) Jordan River walking paths deck areas, including the deck railingsComposite Deck Path on Jordan River Parkway The existing deck and railings were constructed out of trex type decking that has failed causing the surface to flake and come apart. Work will need to include the removal and properly disposing of the existing decking and railing material and then install new decking and railing. The south walking path deck has a gazebo on it. The approximate size of the walking path is 7' wide x 83' long with a 14' x 14' octagon deck with a gazebo at the end. The north walking path has a deck but no gazebo on it. The approximate size to the walking path is 7' wide x 121' long with a 14' x 14' octagon deck at the end. Contractor is required to complete the project by June 30, 2024. Liquidated damages Time is the essence of the Contract Documents. Contractor agrees that the City will suffer damage or financial loss if the project is not completed on the agreed completion time or within any time extensions that are allowed by written pre approval. The Contractor and the City agree that proof of the exact amount of any such damage or loss is difficult to determine. Accordingly, instead of requiring any such proof of damage or specific financial loss or late completion, the Contractor agrees to pay the following sums to the City as liquidated damages and not as a penalty. 1. Late Time Completion: Five hundred dollars and no cents ($500.00) for each day or part thereof that expires after the completion time until the work is accepted as substantially complete. Riverton City reserves the right to make payments with a credit card. If the prices change because of a credit card payment bidder must provide two prices, a price for payment by credit card and a price for payment by check Subcontractors Riverton City reserves the right to approve or reject any subcontractor. The City will not provide drawings, bidder's lists, etc. to subcontractors or suppliers.

Award

Sidewalks / Parking Lot

$77,666.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
31
Bidding Soon
508
All Active Projects
189
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2024

June 7, 2024

img_map_placeholder

Jordan River Pkwy Trail, Riverton, UT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.