Published June 14, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

WATER MAIN RELAYS, at the following locations: N. 9th St. (WT410220629), W. Vliet St. to W. Somers St. (3 working days); W. Oklahoma Av. (N/S) (WT410220639), S. 70th St. (Ext'd) to S. 72nd St. (12 working days); S. 72nd St. (WT410220640), W. Bennett Av. to W. Oklahoma Av. (7 working days); E. Clarke St. (WT410220649), N. 1st St. to N. Hubbard St. (25 working days); W. Glendale Av. (WT410220654), N. 30th St. to N. 32nd St. (14 working days); N. 31st St. (WT410220655), W. Atkinson Av. to W. Glendale Av. (10 working days); W. Cherry St. (WT410220663), N. 12th St. to N. 13th St. (8 working days); N. 12th St. (WT410220664), W. Vliet St. to 215' N/O W. Cherry St. (16 working days); N. 13th St. (WT410220665), W. Kneeland St. to W. Cherry St. (6 working days); W. Kneeland St. (WT410220666), N. 13th St. to N. 14th St. (13 working days); N. 54th St./W. Maxwell Pl. (WT410220672), W. Capitol Dr. to W. Fond Du Lac Av. (21 working days); W. Morgan Av. (WT410220685), S. 84th St. to S. 92nd St. (60 working days); S. 91st St. (WT410220686), 105' N/O W. Morgan Av. to W. Morgan Av. (5 working days); W. Whitaker Av. (WT410230641), W. Bottsford Av. to S. 27th St. (20 working days). (Note: Contractor to furnish and install approximately 9,807 lin. ft. of 16", 12", 8", 6", 4" and 3" ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.) Time for Completion: No construction activity shall be allowed on this contract during the National Republican Convention (RNC) from July 15, 2024 through July 20, 2024. The contractor shall leave all work zones clean, safely barricaded and accessible per the direction of the Construction Engineer. All work in W. Glendale Avenue must be completed by July 26, 2024. All work in this contract, including pavement restoration, must be completed by December 20, 2024. Contactor shall use multiple crews, as necessary, to complete the work per the contract schedule. Liquidated Damages, per diem: $987.00 The residency requirement for this project is 40% of all hours worked on the project. One quarter of these hours must be attributable to residents living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53215, and 53233. The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusion's (OEI) website. . If there are any questions regarding SBE firms, please contact the OEI office at 414-286-5553. The apprenticeship requirements for this project are: one Construction Craft Laborer. If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53215, and 53233 The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. For those bids being submitted through Electronically and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov

Award

Water / Sewer

$2,447,500.00

Public - City

Site Work

30

1

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
108
Bidding Soon
1,170
All Active Projects
633
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

July 15, 2024

img_map_placeholder

Multiple Locations, Milwaukee, WI


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.