BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 14, 2024 at 8:00 PM

Updated June 15, 2024

Site work for a water / sewer project in Stoughton, Wisconsin. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: The installation of a hydrodynamic separator along the storm sewer east of the West Washington Street and South Page Street intersection. Additional Description: The Bid must be accompanied by Bid security made payable to OWNER in an amount of 10% of the Bidder's maximum Bid price. The City of Stoughton reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 85 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder. The Strand Associates, Inc.(R) project manager is Daniel Johnstone and can be contacted at Strand Associates, Inc.(R), 910 West Wingra Drive, Madison, WI 53715, (608) 251 4843, regarding the Project. For further requirements regarding Bid submittal, procedures, and Contract Award, refer to the Instructions to Bidders that are included in the Bidding Documents. Bids from Bidders who are not on the Plan Holders List may be returned as not being responsive. Bid Results: Alternative Bid 1 : Speedway Sand & Gravel, Inc - $425,552.97 Alternative Bid 2 : Speedway Sand & Gravel, Inc - $301,162.97

Award

Water / Sewer

$425,553.00

Public - City

Site Work

8

13

4

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
4
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

August 6, 2024

Project location map

W Washington St, Stoughton, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.