Renovation of a water / sewer project in Hoffman Estates, Illinois. Completed plans call for the renovation of a water / sewer project.
Construction on the Microsoft Data Center located at 2190-2200 Lakewood Blvd began in June 2021. The project requires off-site sanitary sewer pipe upgrades, as well as upgrades to Pfizer Lift Station, to accommodate the planned sanitary flow volume from the data center once complete. The Village is constructing the off-site improvements; however, Microsoft is responsible for the full cost of the design, permitting, construction, and management of the required upgrades. The project is included in the City's 2024-2028 Capital Improvement Program (CIP). As of May 23, 2024, Bidding and is set for June 5, 2024. An engineer has been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. Question Deadline 06/05/2024 SCOPE OF WORK: A. Furnish all labor, materials, equipment, supervision, and testing necessary to demolition the existing dry pit Pfizer Lift Station and construct a new submersible type lift station, as shown on the Drawings and specified herein. B. The work includes, but is not limited to, the following: 1. Cut and abandon the existing dry pit station and by-pass manhole. 2. Remove existing piping, valves, and electrical equipment. 3. Remove access drive. 4. Tree removal. 5. By-pass pumping. 6. Temporary electric service. 7. Maintenance of traffic. 8. New wet well, valve vault, and flow meter manhole. 9. Concrete pads. 10. Discharge piping, valves, forcemain, and electrical equipment. 11. New electrical service. 12. New access drive. 13. New sanitary sewer piping to connect to the new lift station. 14. Site restoration.
Post-Bid
Water / Sewer
$1,800,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2024
February 5, 2025
2090 W Central Rd, Hoffman Estates, IL
Related To This Project
Hoffman Estates, IL
Bid Date: Jun 05 2024
Hoffman Estates, IL
Bid Date: Jul 02 2024
Hoffman Estates, IL
Bid Date: Jul 26 2024
Hoffman Estates, IL
Bid Date: Jul 25 2024
Hoffman Estates, IL
Bid Date: Feb 19 2025
Hoffman Estates, IL
Bid Date: Aug 07 2024
Hoffman Estates, IL
Bid Date: Aug 26 2024
Hoffman Estates, IL
Bid Date: Oct 07 2024
Hoffman Estates, IL
--
Hoffman Estates, IL
--
Hoffman Estates, IL
--
Hoffman Estates, IL
Bid Date: Jun 05 2024
Hoffman Estates, IL
--
Hoffman Estates, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.