BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Kenosha, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project includes crackfilling various City of Kenosha roadways and any other incidental items necessary to complete said work. Pre-Qualification: Yes Site Address: 625 52nd Street, Room 305 Site Directions: Various locations Each bid must contain the full name of every person or company interested in the same and must be accompanied by a contract and bid bond, a certified check, or a bank cashier's check, in the sum of five per cent (5%) of the bid, payable to the City of Kenosha as a guarantee that if the bid is accepted, a contract will be entered into and its performance properly secured within fifteen (15) days of the award of contract. Should any bid be rejected, such check will be forthwith returned to the bidder, and should any bid be accepted, such check will be returned upon the timely and proper execution and securing of the contract. In case the successful bidder shall fail to execute the contract and performance bond, the amount of the bid bond or check shall be forfeited to the City as liquidated damages. SCOPE OF WORK Project #24-1019 - 2024 Joint or Crack Cleaning and Sealing shall consist of routing and/or cleaning cracks or joints in asphalt and concrete pavements, sealing prepared cracks or joints with an approved sealing material, and all incidental items necessary to complete the work as shown on the plans and specifications. The City reserves the right to remove areas as shown in the plan to fit the City's available budget. The City reserves the right to modify the order of streets to be completed or add and delete streets due to priority, emergency cases, or any other reason. All applicable bid items and associated bid unit prices will be paid for any revisions made. The City will mark out all cracks and joints to be routed and/or cleaned and sealed. Only those areas marked shall be considered pay items. In most cases, a City representative will be working with the contractor performing the work or working slightly ahead of work progress. Not all cracks or deteriorated pavement will be routed and/or cleaned and sealed such as significant alligator cracking, extra wide cracks, or other areas the City does not feel this process is advantageous.

Post-Bid

Roads / Highways

$40,000.00

Public - City

Paving, Site Work

3

8

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
122
Bidding Soon
1,912
All Active Projects
805
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2024

July 1, 2024

img_map_placeholder

Multiple Locations, Kenosha, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.