BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Charleston, West Virginia. Completed plans call for site work for a municipal facility.

The West Virginia Purchasing Division is soliciting bids on behalf of the General Services Division to establish a contract for campus concrete repairs, per the bid requirements, specifications, project plans and terms and conditions as attached hereto. Question Deadline 05/23/2024 at 2:00 PM ET Technical questions GENERAL REQUIREMENTS/SPECIFICATIONS SCOPE: The Vendor shall provide, install, and complete concrete services as outlined in the detailed scope of work requirements below. Specific project areas are in drawings B.l- B.4. 1.1.Corner of California Ave. and Piedmont Rd 1. Remove and replace approximately 6’ x 6’ slab and approximately 7’ of damaged curb. Replacement slab will be set on a 4” base of #57 aggregate, with 8” thick, 4500 psi concrete containing a single layer of #4 rebar on 12” centers and doweled into the existing slabs with smooth dowels. The replacement curb will be 6” thick x 12” tall with an exposed 6 of curb doweled into the existing curb to match the existing curb. See Drawing B-l 1.2.Sidewalk in front of Building 9 (Culture Center) Remove and replace approximately 157’ x 16’ of existing 4” sidewalk in front of the Cultural Center. Replacement slab will be set on a 4 base of crusher run aggregate, with 6” thick, 4500 psi concrete containing a single layer of #4 rebar on 12” centers and doweled into the existing slabs with smooth dowels. Install expansion joints at a minimum of 50’ to match the existing control joint pattern. See Drawing B-2. A temporary sidewalk will be required to provide access to the Culture Center from their parking area. 1.3.West dock area curb replacement Remove and replace approximately 75’ of curb on the east side and 48’ on the west side of the area near the west dock entrance. The new curb will consist of 4500 psi concrete set on 4” of#57 aggregate, and the curb will be 6 thick x 12” tall with an exposed 6” of curb doweled in to match the existing curb. See Drawing B-3 1.4.California Ave. parking lot stair installation Install two new sets ofsteps in accordance with the details provided in Exhibit 1. The south steps shall consist of 4500 psi concrete to include approximately 9.5’ ofsidewalk. Sidewalk shall be set on 4” of#57 aggregate, with a slab of 4” concrete reinforced with wire mesh. Steps will include 5 treads measuring 11” deep with a rise of 7”. Railing shall consist ofone rail on the right side, 1 1/2” schedule 40 galvanized pipe, unpainted. The north steps shall consist of 4500 psi concrete to include approximately 6.5’ ofsidewalk. Sidewalk shall be set on 4” of#57 aggregate, with a slab of4” concrete reinforced with wire mesh. Steps will include 3 treads measuring 11” deep with a rise of 7”. Railing shall consist of one rail on the right side, 1 1/2” schedule 40 galvanized pipe, unpainted. See Drawing B-4 and Exhibit 1 Submit Questions to: Melissa Pettrey, Senior Buyer 2019 Washington Street, East Charleston, WV 25305 Fax: (304) 558-3970 Email: Melissa.K.Pettrey@wv.gov

Award

Municipal

$57,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
59
Bidding Soon
833
All Active Projects
486
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 30, 2024

July 1, 2024

September 29, 2024

img_map_placeholder

To Be Determined, Charleston, WV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.