BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in El Paso, Texas. Completed plans call for site work for a water / sewer project.

EP Water reserves the right, at its discretion, to adjust this Bid Schedule as it deems necessary. If necessary, EP Water will communicate adjustments to any Bid Schedule in the form of an addendum. Questions Deadline: 5/28/2024 by 5 p.m. (MST) Answers to Questions: 5/31/2024 by 5:00 pm (MST) All questions regarding the meaning or intent of the Contract Documents must be submitted to Owner via Ion Wave and clicking on Current bids, then the bid # you have a question on and submit your question on the Question Tab. Interpretations or clarifications considered necessary by EPWU staff, Engineer, or Consultant in response to such questions will be issued by Addenda and will be posted on El Paso Water's IonWave electronic bidding (e-bid) website. NOTE: It is not necessary to ask one question per post. Several questions may be asked in one post on Ion Wave. Answers to Questions: 5/31/2024 by 5:00 pm (MST) All questions regarding the meaning or intent of the Contract Documents must be submitted to Owner via Ion Wave and clicking on Current bids, then the bid # you have a question on and submit your question on the Question Tab. Interpretations or clarifications considered necessary by EPWU staff, Engineer, or Consultant in response to such questions will be issued by Addenda and will be posted on El Paso Water's IonWave electronic bidding (e-bid) website. The project entails the relocation of an existing 30-inch steel cylinder concrete pipe that conveys raw wastewater over and across the existing open-channel American Canal next to the International Border and Rio Grande River in El Paso, Texas. The existing 30-inch pipe conflicts with the International Boundary and Water Commission (IBWC) proposed enclosure of the American Canal with pre-cast arched culvert installation In this project the existing 30-inch pipe will be drained, 159 linear feet will be replaced at its current location and raised over the proposed arched culvert. The actual installation work is to be completed between October 1, 2024, and March 31, 2025, with two Milestone completion dates. Milestone 1 involves taking the existing Outfall line out of service, draining the line, removing the existing line where it crosses over the canal and goes under the border fence, and installing temporary plugs/connections by no later than October 14, 2024. After October 14, 2024, Contractor will be responsible for bypassing wastewater from one side of the canal to the other while IBWC Contractor installs arched culvert. Arched culvert installation will be complete by February 13, 2025. Milestone 2 involves installing Owner provided 30-inch ductile iron pipe and fittings over the top of the installed arched culvert, draining the existing Outfall line, and installing permanent tie-ins to existing line on both sides of canal by no later than March 31, 2025. The new 30-inch installation will be partly inside the IBWC levee, and cross underneath the border fence. Included with the work will be close coordination with IBWC's Contractor installing the arched culvert, coordination with Border Patrol, coordination with Department of Homeland Security, coordination with Owner and Engineer, draining the existing 30-inch pipe for completion of Milestone 1 and 2, vactoring and/or pumping of wastewater from two customer lift stations into portable tanks with subsequent disposal at Owner's wastewater treatment plant while the actual tie-work is being completed, bypass pumping while IBWC contractor installs arched culvert, bypass pumping while Milestone 2 work is completed, removal and disposal of the existing 30-inch pipe crossing over the canal, removal and disposal of the existing beams supporting the 30-inch pipe crossing, removal and disposal of two four foot wide concrete trench walls as necessary for installing new pipe, materials testing, trench safety, traffic control, health and safety plan that addresses working in soils containing heavy metals, mobilization, insurances, warranties and other incidentals, fees and services for a complete and operable project.

Post-Bid

Water / Sewer

$4,000,000.00

Public - City

Site Work

28

21

2

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
8
Bidding Soon
261
All Active Projects
117
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

October 1, 2024

img_map_placeholder

Upper Valley Rd, El Paso, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.